MOPIK026 Commissioning and Operation of an Ultrafast Electron Diffraction Facility as Part of the ATF-II Upgrade at Brookhaven National Laboratory 554
 
  • M.G. Fedurin, M. Babzien, C. Folz, M. Fulkerson, K. Kusche, J.J. Li, R. Malone, M.A. Palmer, T.V. Shaftan, J. Skaritka, L. Snydstrup, C. Swinson, F.J. Willeke
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by the US DOE under contract DE-SC0012704.
The Accelerator Test Facility (ATF) at Brookhaven National Laboratory (BNL) is presently carrying out an upgrade, ATF-II, which will provide significantly expanded experimental space and capabilities for its users. One of the new capabilities being integrated into the ATF-II program is an Ultrafast Electron Diffraction (UED) beam line, which was originally deployed in the BNL Source Development Laboratory. Inclusion of the UED in the ATF-II research portfolio will enable ongoing development and extension of the UED capabilities for use in materials research. We describe the design, operation and future plans for the UED beam line at the ATF-II.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-MOPIK026  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPIK038 Muon Sources for Particle Physics - Accomplishments of MAP 1766
 
  • D.V. Neuffer, D. Stratakis
    Fermilab, Batavia, Illinois, USA
  • M.A. Cummings
    Muons, Inc, Illinois, USA
  • J.-P. Delahaye
    SLAC, Menlo Park, California, USA
  • M.A. Palmer
    BNL, Upton, Long Island, New York, USA
  • R.D. Ryne
    LBNL, Berkeley, California, USA
  • D.J. Summers
    UMiss, University, Mississippi, USA
 
  Funding: supported by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the U. S. Department of Energy.
The Muon Accelerator Program (MAP) completed a four-year study on the feasibility of muon colliders and on using stored muon beams for neutrinos. That study was broadly successful in its goals, establishing the feasibility of lepton colliders from the 125 GeV Higgs Factory to more than 10 TeV, as well as exploring using a ' storage ring (MSR) for neutrinos, and establishing that MSRs could provide factory-level intensities of 'e (''e) and ''' ('') beams. The key components of the collider and neutrino factory systems were identified. Feasible designs and detailed simulations of all of these components were obtained, including some initial hardware component tests, setting the stage for future implementation where resources are available and clearly associated physics goals become apparent.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPIK038  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPIK118 Final Assembly and Testing of MICE RF Modules at LBNL 4377
 
  • T.H. Luo, A.R. Lambert, D. Li, S.P. Virostek, J.G. Wallig
    LBNL, Berkeley, California, USA
  • T.G. Anderson, A.D. Bross, D.W. Peterson
    Fermilab, Batavia, Illinois, USA
  • M.A. Palmer
    BNL, Upton, Long Island, New York, USA
  • Y. Torun
    Illinois Institute of Technology, Chicago, Illlinois, USA
 
  Funding: Work supported by the Office of Science, U.S. Department of Energy under DOE contract number DE-AC02-05CH11231
The international Muon Ionization Cooling Experiment aims to demonstrate the transverse cooling of a muon beam by ionization interaction with absorbers and re-acceleration in RF cavities. The final MICE cooling channel configuration has two RF modules, each housing a 201 MHz RF cavity to compensate the longitudinal energy loss in the absorbers. Two RF modules have been assembled and tested at LBNL. This paper reports the final assembly work, as well as the vacuum test and low level RF measurements.
 