- T. Mimashi, Y. Enomoto, N. Iida, M. Kikuchi, K. Kodama, T. Mori, Y. Suetsugu
KEK, Ibaraki, Japan
- K. Abe
Hitachi Power Semiconductor Device, Ltd., Hitachishi, Ibaraki, Japan
- K. Kise, A. Tokuchi
Pulsed Power Japan Laboratory Ltd., Kusatsu-shi Shiga, Japan
|
|
|
New Beam abort system was installed at the Super-KEKB High Energy Ring. It was designed to enlarge the horizontal beam size at the beam extraction window to protect the extraction window, and it also makes the beam abort gap shorter. It consists of four horizontal kicker magnets, one vertical kicker to sweep the beam position in vertical direction, sextupole magnet to enlarge the horizontal beam size, one lambertson magnet, Ti extraction window and beam dump. Four horizontal kicker magnets and one vertical kicker magnet connects to the one power supply. The ceramic chambers cooled by the water are inserted in each kicker coils. The Abort system had been used during SuperKEKB phase 1 operation. This paper describes the performance of the abort system.
|
|