Author: Blas, A.
Paper Title Page
TUPVA128 Performance of the CERN Injector Complex and Transmission Studies into the LHC during the Second Proton-Lead Run 2395
 
  • R. Alemany-Fernández, S.C.P. Albright, M.E. Angoletta, J. Axensalva, W. Bartmann, H. Bartosik, P. Baudrenghien, G. Bellodi, A. Blas, T. Bohl, E. Carlier, S. Cettour-Cave, K. Cornelis, H. Damerau, A. Findlay, S.S. Gilardoni, S. Hancock, A. Huschauer, M.A. Jebramcik, S. Jensen, J.M. Jowett, V. Kain, D. Küchler, A.M. Lombardi, D. Manglunki, T. Mertens, M. O'Neil, S. Pasinelli, Á. Saá Hernández, M. Schaumann, R. Scrivens, R. Steerenberg, H. Timko, V. Toivanen, G. Tranquille, F.M. Velotti, F.J.C. Wenander, J. Wenninger
    CERN, Geneva, Switzerland
 
  The LHC performance during the proton-lead run in 2016 fully relied on a permanent monitoring and systematic improvement of the beam quality in all the injectors. The beam production and characteristics are explained in this paper, together with the improvements realized during the run from the source up to the flat top of the LHC. Transmission studies from one accelerator to the next as well as beam quality evolution studies during the cycle at each accelerator, have been carried out and are summarized in this paper. In 2016, the LHC had to deliver the beams to the experiments at two different energies, 4 Z TeV and 6.5 Z TeV. The properties of the beams at these two energies are also presented  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-TUPVA128  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA035 The PSB Operational Scenario with Longitudinal Painting Injection in the Post-LIU Era 3331
 
  • V. Forte, S.C.P. Albright, M.E. Angoletta, P. Baudrenghien, E. Benedetto, A. Blas, C. Bracco, C. Carli, A. Findlay, R. Garoby, G. Hagmann, A.M. Lombardi, B. Mikulec, M.M. Paoluzzi, J.L. Sanchez Alvarez, R. Wegner
    CERN, Geneva, Switzerland
 
  Longitudinal painting has been presented as an elegant technique to fill the longitudinal phase space at injection to the CERN PSB once it is connected with the new Linac4. Painting brings several advantages related to a more controlled longitudinal filamentation, lower peak line density and beating reduction, resulting in a smaller space-charge tune spread. This could be an advantage especially for high intensity beams (> 6·1012 protons per bunch) to limit losses on the transverse acceptance of the machine. This paper presents an overview on the possible advantages of the technique for operational and test beams, taking care of the hardware limitations and possible failure scenarios.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA035  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPVA037 Machine Development Studies in the CERN PS Booster, in 2016 3339
 
  • E. Benedetto, S.C.P. Albright, M.E. Angoletta, W. Bartmann, J.M. Belleman, A. Blas, M. Cieslak-Kowalska, G.P. Di Giovanni, A. Findlay, V. Forte, A. Garcia-Tabares, G. Guidoboni, S. Hancock, M. Jaussi, B. Mikulec, J.C. Molendijk, A. Oeftiger, T.L. Rijoff, F. Schmidt, P. Zisopoulos
    CERN, Geneva, Switzerland
  • M. Cieslak-Kowalska
    EPFL, Lausanne, Switzerland
  • P. Zisopoulos
    Uppsala University, Uppsala, Sweden
 
  The paper presents the outstanding studies performed in 2016 in preparation of the PS Booster upgrade, within the LHC Injector Upgrade project (LIU), to provide twice higher brightness and intensity to the High-Luminosity LHC. Major changes include the increase of injection and extraction energy, the implementation of a H charge-exchange injection system, the replacement of the present Main Power Supply and the deployment of a new RF system (and related Low-Level), based on the Finemet technology. Although the major improvements will be visible only after the upgrade, the present machine can already benefit of the work done, in terms of better brightness, transmission and improved reproducibility of the present operational beams. Studies address the space-charge limitations at low energy, for which a detailed optics model is needed and for which mitigation measurements are under study, and the blow-up reduction at injection in the downstream machine, for which the beams need careful preparation and transmission. Moreover they address the requirements and the reliability of new beam instrumentation and hardware that is being installed in view of LIU.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2017-WEPVA037  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)