Optimisation of Electrical and Instrumentation Design for the Diamond Light Source DDBA Upgrade |
448 |
|
- A. Thomson, C.A. Abraham, M.T. Heron, S.C. Lay, G. Rehm, A.J. Rose, H.S. Shiers
DLS, Oxfordshire, United Kingdom
|
|
|
In planning the upgrade of one cell of the Diamond Storage Ring, the DDBA upgrade, it was evident that the electrical installation and commissioning would contribute a significant component of the overall installation time. Given the pressures to minimise the shutdown length, the electrical and instrumentation design was optimised for time effective installation and commissioning. This paper outlines the electrical and instrumentation design for DDBA; explores the installation time determining issues and how these were addressed; and reports on the lessons learnt from the actual installation and commissioning process.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2017-MOPAB133
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|