Present Status of the L3BT for J-PARC
|
1756 |
|
- T. Ohkawa
JAEA, Ibaraki-ken
- M. Ikegami
KEK, Ibaraki
- J. Qiang
LBNL, Berkeley, California
|
|
|
L3BT is a beam transport line from J-PARC (Japan Proton Accelerator Research Complex) linac to the succeeding 3-GeV RCS (Rapid Cycling Synchrotron). The construction of the L3BT has been almost finished. The beam commissioning of the L3BT will be started soon. On the other hand we have performed 3D particle simulations with PARMILA and IMPACT to evaluate the performance of the halo scraping, momentum compaction and beam diagnostics. In this paper, results of the beam simulation of the L3BT are presented. The construction status of the L3BT is also presented in brief.
|
|