Author: Zimmer, C.M.
Paper Title Page
MOPLM24 LCLS-II Injector Commissioning Beam Based Measurements 157
 
  • C.M. Zimmer, T.J. Maxwell, F. Zhou
    SLAC, Menlo Park, California, USA
 
  Funding: Department of Energy
Injector commissioning is underway for the LCLS-II MHz repetition rate FEL, currently under construction at SLAC. Methodology of injector beam-based measurements and early results with low beam charge will be presented, along with the software tools written to automate these various measurements.
 
poster icon Poster MOPLM24 [10.104 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-MOPLM24  
About • paper received ※ 28 August 2019       paper accepted ※ 31 August 2019       issue date ※ 08 October 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)