Author: Warner, A.
Paper Title Page
WEXBA2 Recent Results and Opportunities at the IOTA Facility 599
 
  • A.L. Romanov, D.R. Broemmelsiek, K. Carlson, D.J. Crawford, N. Eddy, D.R. Edstrom, J.D. Jarvis, V.A. Lebedev, S. Nagaitsev, J. Ruan, J.K. Santucci, V.D. Shiltsev, G. Stancari, A. Valishev, A. Warner
    Fermilab, Batavia, Illinois, USA
  • S. Chattopadhyay, S. Szustkowski
    Northern Illinois University, DeKalb, Illinois, USA
  • Y.K. Kim, N. Kuklev, I. Lobach
    University of Chicago, Chicago, Illinois, USA
 
  The Integrable Optics Test Accelerator (IOTA) was recently commissioned as part of the Fermilab Accelerator Science and Technology (FAST) facility. The IOTA ring was briefly operated with electrons at 47 MeV followed by a 6-months run with 100 MeV electrons. The main goal of the first run was to study beam dynamics in the integrable lattices with elliptical nonlinear magnets and in the quasi-integrable case with profiled octupole channel. The flexibility of the IOTA ring allowed a wide range of complementary studies, such as experiments with a single electron; studies of fluctuations in undulator radiation and operation with low emittance beams. Over the next year the proton injector will be installed and two runs carried out. One run will be dedicated to the refinement of nonlinear experiments and another will be dedicated to the proof-of-principle demonstration of Optical Stochastic Cooling.  
slides icon Slides WEXBA2 [12.702 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-WEXBA2  
About • paper received ※ 31 August 2019       paper accepted ※ 05 September 2019       issue date ※ 08 October 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPLH02 Experience with Long-Pulse Operation of the PIP2IT Warm Front End 803
 
  • A.V. Shemyakin, J.-P. Carneiro, A.Z. Chen, D. Frolov, B.M. Hanna, R. Neswold, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, A. Warner, J.Y. Wu
    Fermilab, Batavia, Illinois, USA
  • C.J. Richard
    NSCL, East Lansing, Michigan, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The warm front end of the PIP2IT accelerator, assembled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H ion source, a 2-m long Low Energy Beam Transport (LEBT) line, a 2.1-MeV, 162.5 MHz CW RFQ, followed by a 10-m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation in regimes where the average beam power in this front end emulates the operation of the proposed PIP-II accelerator, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encountered and some of the solutions that were implemented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-WEPLH02  
About • paper received ※ 20 August 2019       paper accepted ※ 01 September 2019       issue date ※ 08 October 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)