Author: Ross, M.C.
Paper Title Page
MOZBA1 LCLS-II SC Linac: Challenges and Status 51
 
  • M.C. Ross
    SLAC, Menlo Park, California, USA
 
  Funding: ∗ This work was supported by the US Department of Energy (DOE) under contract DE-AC02-76SF00515
The Linac Coherent Light Source II (LCLS-II) project requires the assembly, test, and installation of 37 cry-omodules (CM) in order to deliver a 4 GeV CW electron beam to the FEL undulators for production of both hard and soft X-ray pulses at a repetition rate of up to 1 MHz. All of the cryomodules will operation in continuous wave mode, with 35 operating at 1.3 GHz for acceleration and 2 operating at 3.9 GHz to linearize the longitudinal beam profile. The assembly and testing of the 1.3 GHz cry-omodules is nearing completion and the 3.9 GHz cry-omodules work is entering to assembly and testing phase. Roughly 60% of the cryomodules have been shipped to SLAC for installation in the accelerator enclosure. The status and challenges of these efforts will be reported in this paper.
 
slides icon Slides MOZBA1 [80.533 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-MOZBA1  
About • paper received ※ 02 September 2019       paper accepted ※ 12 September 2019       issue date ※ 08 October 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)