Paper |
Title |
Page |
MOYBA2 |
Commissioning of the Phase 2 and Phase 3 SuperKEKB / B-Factory |
14 |
|
- S. Nakamura
KEK, Ibaraki, Japan
|
|
|
The next generation of B-Factory, the SuperKEKB electron-positron collider at KEK (Japan) has started after two years shutdown from the Phase 1 commissioning in 2016. The first phase for the vacuum scrubbing in 2016 and the second phase focused on the verification of the novel "nano-beam" collision scheme were successfully completed in 2018. The modifications between Phase 1 and Phase 2 follows Phase 3 are installations of the final focus system and the Belle II detector. In order to accomplish the higher luminosity more than the predecessor KEKB , the nano-beam scheme is studied with higher bunch currents to reduce the beam-beam blowup which degrade the luminosity. The new collision scheme is reviewed and the luminosity performance and overall status in the Phase 2 and Phase 3 commissioning are presented.
|
|
|
Slides MOYBA2 [13.453 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-NAPAC2019-MOYBA2
|
|
About • |
paper received ※ 30 August 2019 paper accepted ※ 01 September 2019 issue date ※ 08 October 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|