Paper |
Title |
Page |
MOZBA6 |
The Broad-Band Impedance Budget of the Accumulator Ring in the ALS-U Project |
74 |
MOPLM26 |
|
|
- D. Wang, S. De Santis, D. Li, T.H. Luo, M. Venturini
LBNL, Berkeley, California, USA
- K.L.F. Bane
SLAC, Menlo Park, California, USA
|
|
|
Design work is underway for the upgrade of the Advanced Light Source (ALS-U) to a diffraction-limited soft x-rays radiation source. It consists of an accumulator and a storage ring. In both rings, coupling-impedance driven instabilities need careful evaluation to ensure meeting the machine high-performance goals. This paper presents the impedance budget of the accumulator ring both longitudinally and transversely. The budget includes the resistive wall impedance as well as the geometric impedance from the main vacuum components. Our calculations primarily rely on electromagnetic simulations with the CST code; when possible validation has been sought against analytical modeling, typically in the low-frequency limit, and good agreement generally found. Collective-instability current thresholds are also discussed.
|
|
|
Slides MOZBA6 [8.926 MB]
|
|
|
Poster MOZBA6 [3.542 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-NAPAC2019-MOZBA6
|
|
About • |
paper received ※ 27 August 2019 paper accepted ※ 06 September 2019 issue date ※ 08 October 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|