The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
TY - CONF AU - Ao, H. AU - Beher, S. AU - Bultman, N.K. AU - Casagrande, F. AU - Compton, C. AU - Curtin, J.C. AU - Davidson, K.D. AU - Elliott, K. AU - Facco, A. AU - Ganni, V. AU - Ganshyn, A. AU - Gibson, P.E. AU - Grender, I. AU - Hartung, W. AU - Hodges, L. AU - Holland, K. AU - Hussain, A. AU - Ikegami, M. AU - Jones, S. AU - Knudsen, P. AU - Laxdal, R.E. AU - Lidia, S.M. AU - Machicoane, G. AU - Miller, S.J. AU - Morris, D.G. AU - Ostroumov, P.N. AU - Popielarski, J.T. AU - Popielarski, L. AU - Priller, J. AU - Russo, T. AU - Saito, K. AU - Stanley, S. AU - Victory, D.R. AU - Wang, X. AU - Wei, J. AU - Xu, M. AU - Xu, T. AU - Yamazaki, Y. AU - Zhao, S. ED - Yamazaki, Yoshishige ED - Raubenheimer, Tor ED - McCausey, Amy ED - Schaa, Volker RW TI - FRIB Driver Linac Integration to be ready for Phased Beam Commissioning J2 - Proc. of NAPAC2019, Lansing, MI, USA, 01-06 September 2019 CY - Lansing, MI, USA T2 - North American Particle Accelerator Conference T3 - 4 LA - english AB - The driver linac for Facility for Rare Isotope Beams (FRIB) will accelerate all stable ion beams from proton to uranium beyond 200 MeV/u with beam powers up to 400 kW. The linac now consists of 10⁴ superconducting quarter-wave resonators (QWR), which is the world largest number of low-beta SRF cavities operating at an accelerator facility. The first 3 QWR cryomodules (CM) (β = 0.041) were successfully integrated with cryogenics and other support systems for the 2nd Accelerator Readiness Review (ARR). The 3rd ARR scope that includes 11 QWR CM (β=0.085) and 1 QWR matching CM (β=0.085) was commissioned on schedule by January 2019, and then we met the Key Performance Parameters (KPP), accelerating Ar and Kr > 16 MeV/u at this stage, in a week upon the ARR authorization. We examine a variety of key factors to the successful commissioning, such as component testing prior to system integration, assessment steps of system/device readiness, and phased commissioning. This paper also reports on the integration process of the β=0.085 CMs including the test results, and the current progress on β=0.29 and 0.53 CMs in preparation for the upcoming 4th ARR. PB - JACoW Publishing CP - Geneva, Switzerland SP - 823 EP - 826 KW - MMI KW - SRF KW - cryomodule KW - cavity KW - linac DA - 2019/10 PY - 2019 SN - 2673-7000 SN - 978-3-95450-223-3 DO - doi:10.18429/JACoW-NAPAC2019-WEPLH09 UR - http://jacow.org/napac2019/papers/weplh09.pdf ER -