Title |
Power Converters for the ESS Warm Magnets: Procurement Status |
Authors |
- R. Visintini, M. Cautero, T.N. Gucin
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
- C.A. Martins
ESS, Lund, Sweden
|
Abstract |
In the frame of the Italian In-Kind collaboration for the construction of the European Spallation Source (ESS), Elettra Sincrotrone Trieste research center is in charge, among all, of the provision of the power converters for the warm magnets of the superconducting part of the linear accelerator and of the proton beam transport line. The procurement process is running for all types of power converters. The first components have been delivered to ESS already in March 2018, while the Dipole and Quadrupole power converters are under construction. The first batches have been factory tested and shipped to Lund. The corrector power converters have been manufactured and are currently tested and calibrated at Elettra before their delivery to ESS.
|
Paper |
download TUPMP012.PDF [1.382 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2019 |
Series |
International Particle Accelerator Conference (10th) |
Location |
Melbourne, Australia |
Date |
19-24 May 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) |
Online ISBN |
978-3-95450-208-0 |
Received |
09 May 2019 |
Accepted |
22 May 2019 |
Issue Date |
21 June 2019 |
DOI |
doi:10.18429/JACoW-IPAC2019-TUPMP012 |
Pages |
1251-1254 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|