Title |
There-Dimensional Simulation of a C-Band 32-Beam Klystron |
Authors |
- Z.N. Liu, H.B. Chen, J. Shi, H. Zha
TUB, Beijing, People’s Republic of China
|
Abstract |
A 32-beam klystron working at 5.712 GHz has been designed with efficiency of 70% and output power of 3.4 MW. Core oscillations method (COM) is chosen to bunch electrons. The code KlyC is used for 1-D and 1.5-D calculation and a series of parameters are given after optimizing, including the position, frequency, R/Q, Q₀ and Qe of cavities. CST/PIC is used to make the final design and coaxial cavities are used. This paper describes 1-D, 1.5-D and 3-D beam dynamics of the klystron, compares their differences, and analyses effect of these differences on efficiency.
|
Paper |
download THPTS038.PDF [2.255 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2019 |
Series |
International Particle Accelerator Conference (10th) |
Location |
Melbourne, Australia |
Date |
19-24 May 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) |
Online ISBN |
978-3-95450-208-0 |
Received |
15 May 2019 |
Accepted |
22 May 2019 |
Issue Date |
21 June 2019 |
DOI |
doi:10.18429/JACoW-IPAC2019-THPTS038 |
Pages |
4190-4193 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|