Title |
Impedance Reduction in the CERN SPS Through Element Layout Optimisation |
Authors |
- A. Farricker, C. Vollinger
CERN, Geneva, Switzerland
|
Abstract |
The CERN accelerator complex is currently in its long shutdown while the LHC Injector Upgrade is being carried out. The upgrade of the SPS includes but is not limited to: the relocation of the beam dumping system, upgrade of the RF system, replacement of the electrostatic septa and impedance reduction. These major upgrades present an opportunity to perform additional impedance reduction in areas not normally modified due to the large amount of work being performed across the accelerator complex. In this paper, we look at the impedance minimization in the sections near the large aperture quadrupoles of the extraction regions in the CERN SPS. By optimizing the locations of existing equipment and the introduction of a new, more impedance optimised type of bellows, significant reductions in the beam-coupling impedance can be achieved.
|
Paper |
download MOPGW077.PDF [1.769 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2019 |
Series |
International Particle Accelerator Conference (10th) |
Location |
Melbourne, Australia |
Date |
19-24 May 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) |
Online ISBN |
978-3-95450-208-0 |
Received |
08 May 2019 |
Accepted |
20 May 2019 |
Issue Date |
21 June 2019 |
DOI |
doi:10.18429/JACoW-IPAC2019-MOPGW077 |
Pages |
277-280 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|