Author: Zubyk, A.
Paper Title Page
WEXGBF1 Testing of the ESS MB-IOT Prototypes 1759
 
  • M. Jensen
    ESS, Lund, Sweden
  • C. Bel, A. Beunas, D. Bussiere, P. Cacheux, V. Hermann, J.C. Racamier, C. Robert
    TED, Thonon, France
  • M. Boyle, H. Schult
    L-3, Williamsport, Pennsylvania, USA
  • G. Cipolla, E. Montesinos, M.S.B. Sanchez Barrueta
    CERN, Geneva 23, Switzerland
  • T. Kimura, P.E. Kolda, P. Krzeminski, L. Kurek, S. Lenci, O.S. Sablic, L. Turek, C. Yates
    CPI, Palo Alto, California, USA
  • M.F. Kirshner
    LANL, Los Alamos, New Mexico, USA
  • R.D. Kowalczyk, A.V. Sy, B.R. Weatherford
    SLAC, Menlo Park, California, USA
  • A. Zubyk
    L3 EDD, Williamsport, USA
 
  ESS is considering the use of MB-IOTs for parts of the high-beta linac. Two prototypes have been built by indus-try, namely L3 and CPI/Thales and have passed the factory acceptance test with excellent results. Both tubes will go through further extensive testing at CERN for ESS follow-ing delivery and a final decision on tube technology will be taken in April 2018. This invited talk presents the back-ground for the technical decision of IOTs vs klystrons, associated impact for ESS, and latest plans for industrial production of these IOTs for ESS.  
slides icon Slides WEXGBF1 [9.836 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEXGBF1  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)