TUPAL037 | Installation Progress on FRIB β=0.041 Cryomodules Toward Beam Commissioning | 1087 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 The Facility for Rare Isotope Beams (FRIB) driver linac is to accelerate all the stable ion beams from proton to uranium beyond 200 MeV/u with beam powers up to 400 kW, which will be the first large-scale, CW SRF ion linac. The beam commissioning of the front end (from the ion source to the RFQ) already began and is in progress. The Accelerator Readiness Review (ARR) for beam through the first three β=0.041 cryomodules is scheduled for May 2018. The next step is the beam commissioning through the 12 SRF cavities housed in these 3 cryomodules with 6 superconducting solenoid magnets. The cryomodules and the adjacent warm diagnostics boxes in between have been already installed and aligned in the tunnel. This paper describes the installation progress of the β=0.041 cryomodules and plans for ARR02. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL037 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THYGBF4 | Accelerator Physics Advances in FRIB (Facility for Rare Isotope Beams) | 2950 |
|
||
Funding: Work supported by the U.S. DOE Office of Science under Cooperative Agreement DE-SC0000661 and the NSF under Cooperative Agreement PHY-1102511, the State of Michigan and Michigan State University. This paper presents recent developments of accelerator physics related topics for the Facility for Rare Isotope Beams (FRIB) being built at Michigan State University. While extensive beam dynamics simulations including all known errors do not show uncontrolled beam losses in the linac, ion beam contaminants extracted from the ECR ion source together with main ion beam can produce significant losses after the charge stripper. These studies resulted in development of beam collimation system at relatively low energy of 16 MeV/u and room temperature bunchers instead of originally planned superconducting ones. Commissioning of the Front End enabled detailed beam physics studies accompanied with the simulations using several beam dynamics codes. Settings of beam optics devices from the ECR to MEBT has been developed and applied to meet important project milestones. Similar work is planned for the beam commissioning of the first 3 cryomodules in the superconducting linac. |
||
![]() |
Slides THYGBF4 [11.092 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THYGBF4 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL035 | Design of β=0.65, 5 Cells, 644 MHz Elliptical Cavity for FRIB Upgrade | 3712 |
|
||
Funding: Work supported by the U.S. DOE Office of Science under Cooperative Agreement DE-SC0000661 and the NSF under Cooperative Agreement PHY-1102511, the State of Michigan and Michigan State University. The superconducting (SC) linac of the Facility for Rare Isotope Beams (FRIB) under construction will deliver 200 MeV/u, 400 kW beam to the target for producing rare isotopes at Michigan State of University (MSU). For further beam energy upgrade, we have designed the β = 0.65, 5 cells, 644 MHz elliptical cavity. The beam energy can be upgraded to 400 MeV/u by installing 11 cryomodules to the available space in the FRIB tunnel. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL035 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |