Paper |
Title |
Page |
WEPAF066 |
The New CLIC Main Linac Installation and Alignment Strategy |
1979 |
|
- H. Mainaud Durand, J. Gayde, J. Jaros, M. Sosin, A. P. Zemanek
CERN, Geneva, Switzerland
- V. Rude
ESGT-CNAM, Le Mans, France
|
|
|
A complete solution has been proposed for the pre-alignment of the CLIC main linac in 2012 for the Conceptual Design Report. Two recent studies provide new perspectives for such a pre-alignment. First in a study on Particle Accelerator Components' Metrology and Alignment to the Nanometre scale (PACMAN), new solutions to fiducialise and align different types of components within a micrometric accuracy on the same support were proposed and validated, using a stretched wire. Secondly, a 5 degree of freedom adjustment platform with plug-in motors showed a very accurate and efficient way to adjust remotely components. By combining the results of both studies, two scenarios of installation and alignment for the CLIC main linac are proposed, providing micrometric and automatized solutions of micrometric assembly, fiducialisation and alignment in metrological labs or in the tunnel. In this paper, the outcome of the two studies are presented; the two scenarios of installation and alignment are then detailed and discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAF066
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|