THPAL120 | Cryogenics Infrastructure at TRIUMF's Particle Accelerator Facilities | 3925 |
|
||
Funding: TRIUMF receives federal funding via a contribution agreement with the National Research Council of Canada. Cryogenic infrastructure is an indispensable part of TRIUMF accelerator facilities. At the moment TRIUMF operates three helium cryogenic systems supporting operation of three major accelerator systems: 520 MeV proton cyclotron, superconductive radio-frequency (SRF) heavy ion linear accelerator at the Rare Isotope Beams (RIB) facility, and SRF electron linear accelerator (e-linac) at Advanced Rare IsotopE Laboratory (ARIEL). Applications of cryogenic thermal loads vary from cryogenic absorption pumping of the cyclotron vacuum tank to cryogenic cooling of superconducting (SC) RF cavities of production accelerators and support of research and development at SRF department. Wide range of production techniques for cryogenic refrigeration includes helium refrigerators based on both piston and turbine expansion coldboxes for both 4 K and 2 K temperature cryogenic loads. This paper presents the details of TRIUMF cryogenic systems as well as operational experience of various cryogenic installations. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL120 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL121 | The Operational Experience of E-Linac Cryogenic System at TRIUMF | 3928 |
|
||
Funding: ARIEL is funded by CFI, the Provinces of AB, BC, MA, ON, QC, and TRIUMF. TRIUMF receives federal funding via a contribution agreement with the National Research Council of Canada. The new Advanced Rare IsotopE Laboratory (ARIEL) is a major expansion of the Rare Isotope Beams (RIB) facility at TRIUMF. Superconducting radio-frequency (SRF) cavities cooled down to 2 K are the key part of ARIEL electron linear accelerator (e-linac). Design of the cryogenic system was bound to follow both phased project schedule and existing building infrastructure. Due to the scheduling of commissioning and R&D activities of ARIEL project, high availability requirements were set for e-linac cryogenic system during its commissioning stage. Various upgrades were introduced during system commissioning in order to improve overall availability and reliability of the system. This paper presents the details of operational experience, commissioning activities and continuous improvement of various operational aspects of e-linac cryogenic system. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL121 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |