WEXGBF3 RF System for FRIB Accelerator 1765
 
  • D.G. Morris, J. Brandon, N.K. Bultman, K.D. Davidson, A. Facco, P.E. Gibson, L. Hodges, M.G. Konrad, T.L. Larter, H. Maniar, P. Morrison, P.N. Ostroumov, J.T. Popielarski, G. Pozdeyev, H.T. Ren, T. Russo, K. Schrock, R. Walker, J. Wei, T. Xu, Y. Xu, S. Zhao
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
 
  The RF system of the FRIB driver accelerator includes solid state amplifiers up to 18 kW operating at frequencies from 80.5 MHz to 322 MHz. Much higher power is required for the normal conducting RFQ, ~100 kW, and it is based on vacuum tubes. This invited talk presents the performance of solid state amplifiers and LLRF in off-line testing and on-line testing of the RFQ amplifier.  
slides icon Slides WEXGBF3 [14.107 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEXGBF3  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYGBF4 Accelerator Physics Advances in FRIB (Facility for Rare Isotope Beams) 2950
 
  • P.N. Ostroumov, N.K. Bultman, M. Ikegami, S.M. Lidia, S.M. Lund, G. Machicoane, T. Maruta, A.S. Plastun, G. Pozdeyev, X. Rao, J. Wei, T. Xu, T. Yoshimoto, Q. Zhao
    FRIB, East Lansing, USA
  • C.Y. Wong
    NSCL, East Lansing, Michigan, USA
 
  Funding: Work supported by the U.S. DOE Office of Science under Cooperative Agreement DE-SC0000661 and the NSF under Cooperative Agreement PHY-1102511, the State of Michigan and Michigan State University.
This paper presents recent developments of accelerator physics related topics for the Facility for Rare Isotope Beams (FRIB) being built at Michigan State University. While extensive beam dynamics simulations including all known errors do not show uncontrolled beam losses in the linac, ion beam contaminants extracted from the ECR ion source together with main ion beam can produce significant losses after the charge stripper. These studies resulted in development of beam collimation system at relatively low energy of 16 MeV/u and room temperature bunchers instead of originally planned superconducting ones. Commissioning of the Front End enabled detailed beam physics studies accompanied with the simulations using several beam dynamics codes. Settings of beam optics devices from the ECR to MEBT has been developed and applied to meet important project milestones. Similar work is planned for the beam commissioning of the first 3 cryomodules in the superconducting linac.
 
slides icon Slides THYGBF4 [11.092 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THYGBF4  