Paper | Title | Page |
---|---|---|
TUPAL059 | Commissioning of Shanghai Advance Proton Therapy | 1151 |
|
||
Shanghai advance proton therapy (SAPT) is a dedicate facility for cancer treatment. The commissioning of the accelerator started at the end of April 2017, and the proton beam has been already transported to the treatment room. This paper shows the commissioning results of synchrotron and transport line. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL059 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAL073 | Conceptual Design of a Drift Tube LINAC for Proton Therapy | 1182 |
SUSPF056 | use link to see paper's listing under its alternate paper code | |
|
||
Funding: National Key Research and Development Program of China (grant number 2016YFC0105408) The conceptual design of an Alvarez-type Drift Tube Linac for one proton therapy facility is described in this paper. The design optimization of the Drift Tube Linac is carried out in the principle of adopting domestic mature technologies and cost control. The error study of the Drift Tube Linac is also given in this paper. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL073 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |