TUPAL046 Construction, Test, and Operation of a new RFQ at the Spallation Neutron Source (SNS) 1113
 
  • Y.W. Kang, A.V. Aleksandrov, W.E. Barnett, M.S. Champion, M.T. Crofford, B. Han, S.W. Lee, J. Moss, R.T. Roseberry, J.P. Schubert, A.P. Shishlo, M.P. Stockli, C.M. Stone, R.F. Welton, D.C. Williams, A.P. Zhukov
    ORNL, Oak Ridge, Tennessee, USA
  • C.C. Peters, J. Price
    ORNL RAD, Oak Ridge, Tennessee, USA
 
  Funding: * This work was supported by SNS through UT-Battelle, LLC, under contract DEAC0500OR22725 for the U.S. DOE.
A new RFQ was successfully installed recently in the SNS linac to replace the old RFQ that was used for more than a decade with certain operational limitations. The new RFQ was completely tested with H ion source in the Beam Test Facility (BTF) at SNS. For robust operation of SNS at 1.4 MW, the full design beam power and to satisfy the beam current requirement of the forthcoming SNS proton power upgrade (PPU) project, an RFQ with enhanced performance and reliability was needed. The new RFQ was built to have the beam parameters identical to those of the first RFQ but with improved RF and mechanical stability and reliability for continuous operation of neutron production. The tests confirmed that the new RFQ can run with high beam transmission efficiency at around 90 % and notably improved operational stability. In this paper, construction, test, installation, and operation of the new RFQ in SNS are discussed with the performance improvements.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL046  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)