THPAL002 | RF System Operation of High Current RFQ in ADS Project | 3613 |
|
||
Funding: Work supported by Natural Science Foundation of China, No.11505253 New RF system has been upgraded several times for high-current operation, especially for extra beam power and detuning angle. The current was increased gradually resulting in more and more frequency detuning, and an effective method is to tune the temperature of cavity to compromise detuning. Of course, the power dissipated in cavity and high intensity beam are approximately 120kW resulting in too many power modules operated in the high risk of failure. The specific analysis and simulation were introduced in detail. |
||