Author: Tydecks, T.
Paper Title Page
MOPMF057 FCC-ee Dynamic Aperture Studies and Frequency Map Analysis 244
 
  • T. Tydecks, S. Aumon, T.K. Charles, B. Härer, B.J. Holzer, K. Oide, Y. Papaphilippou, J. Wenninger
    CERN, Geneva, Switzerland
 
  The FCC-ee Lepton Collider will provide e+e collisions in the beam energy range of 45.6 GeV to 182.5 GeV. FCC-ee will be a precision measurement tool for Z, W, H and t physics with expected luminosities of 2.07× 1036 cm-2 s-1 at the Z-pole and 1.3 × 1034 cm-2 s-1 at the tt- threshold. In order to achieve the foreseen luminosities, a vertical β* of 1 mm to 2 mm is mandatory. Dynamic aperture and frequency map analysis for the 97.75 km machine with such a squeezed accelerator optics are studied. Furthermore, effects of machine misalignments on dynamic and momentum aperture are presented and estimations for the required tolerances are given  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF057  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMF058 Status of the LHC Schottky Monitors 247
 
  • T. Tydecks, D. Alves, T.E. Levens, M. Wendt, J. Wenninger
    CERN, Geneva, Switzerland
 
  The Large Hadron Collider (LHC) features four transverse Schottky monitors detecting Schottky noise from the beam. From the Schottky noise signal, beam properties like tune, chromaticity, and bunch by bunch relative emittances, can be extracted. Being a non-destructive and purely parasitic method of measurement, the Schottky system is of great interest for real-time determination of beam chromaticities especially. Studies, including a dedicated machine development shift as well as parasitic measurements, concerning its capability to accurately measure the beam chromaticities are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMF059 Status of the FCC-ee Top-Up Booster Synchrotron 250
 
  • B. Härer, B.J. Holzer, Y. Papaphilippou, T. Tydecks
    CERN, Geneva, Switzerland
 
  This contribution presents the status of the top-up booster synchrotron for the FCC electron-positron collider FCC-ee, which is a 100 km electron-positron collider being designed for precision studies and rare decay observations in the range of 90 to 365 GeV centre-of-mass energy. In order to keep the luminosity at a level of the order of 1035 cm-2s-1 continuous top-up injection is required, because of the short beam lifetime of less than one hour. The top-up booster synchrotron will be housed in the same tunnel as the collider rings and will ramp up the beam energy from 20 GeV at injection to the full energy between 45.5 GeV and 182.5 GeV depending on operation mode. The lattice design and two possible optics will be presented. The dynamic aperture was investigated for different sextupole schemes with and without misalignments of the lattice components. In addition, wigglers were installed to decrease the damping time and mitigate intra-beam-scattering.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF059  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAF086 Beam Dynamics Simulations for Operating a Robinson Wiggler at the MLS 3189
 
  • J. Li, J. Feikes, M. Ries
    HZB, Berlin, Germany
  • T. Tydecks
    CERN, Geneva, Switzerland
 
  A Robinson wiggler is planned to be installed in the storage ring of the Metrology Light Source (the MLS). The Robison wiggler (RW) is a device consisting of a chain of combined-function magnets (CFMs), intended to manipulate the damping partition numbers and thus adjust the longitudinal emittance. The objective is to lengthen the bunch in order to improve the Touschek lifetime. However, the nonlinear perturbation of the beam dynamics due to the Robinson wiggler could limit the achievable improvement. Therefore, a symplectic method of modeling the wiggler has been established to study these nonlinear effects. Optimized solutions have been developed for both the ramping procedure and the future daily operation of the wiggler and are presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAF086  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)