Paper | Title | Page |
---|---|---|
TUPAL049 | SNS Proton Power Upgrade Status | 1120 |
|
||
Funding: ORNL is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE. This research was supported by the DOE Office of Science, Basic Energy Science, Scientific User Facilities. The Spallation Neutron Source (SNS) Proton Power Upgrade (PPU) project aims to double the proton accelerator beam power from 1.4 to 2.8 MW. Over the past year PPU has completed the reviews necessary for Critical Decision-1 approval. The baseline design choices are being refined, and a cost-effective approach has been identified. The beam energy will be increased by 30% and the beam current capability improved by ~50%. The sub-system improvements and anticipated schedule will be discussed. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL049 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |