TUPAF085 Status of Link Existing Facility Project for FAIR 934
 
  • J. Stadlmann, C. Omet, A. Schuhmann, P.J. Spiller
    GSI, Darmstadt, Germany
 
  The project "Link existing Facility", or GaF (GSI Anbindung an FAIR), is an important subproject of the overall FAIR facility. In order to serve as injector for SIS100, the main accelerator of FAIR, the existing GSI synchrotron SIS18 is undergoing an upgrade program leading to about 100 times higher beam intensities. Especially the foreseen operation with 4 GeV Protons with up to 5·1012 protons per second increases the radiation protection requirements to such an extent that the existing radiation protection measures are no longer sufficient. The project consists of 78 individual measures. The four most substantial activities are the construction of a table-like structure to carry additional shielding. The creation of an opening and a first part of transfer tunnel for the beamlines towards the future FAIR campus. The preparation for the building, beam dump and connection of the FAIR proton injector. The incorporation of state-of-the-art radiation- and fire-protection measures into the present facilities including the a new technical building to house technical infrastructure. We report on the project status which is foreseen to finish mid-2018.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF085  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYGBF3 Challenges of FAIR Phase 0 2947
 
  • M. Bai, A. Adonin, S. Appel, R. Bär, M.C. Bellachioma, U. Blell, C. Dimopoulou, G. Franchetti, O. Geithner, P. Gerhard, L. Groening, F. Herfurth, R. Hess, R. Hollinger, H.C. Hüther, H. Klingbeil, A. Krämer, S.A. Litvinov, F. Maimone, D. Ondreka, N. Pyka, S. Reimann, A. Reiter, M. Sapinski, B. Schlitt, G. Schreiber, M. Schwickert, D. Severin, R. Singh, P.J. Spiller, J. Stadlmann, M. Steck, R.J. Steinhagen, K. Tinschert, M. Vossberg, G. Walter, U. Weinrich
    GSI, Darmstadt, Germany
 
  After two-year's shutdown, the GSI accelerators plus the latest addition of storage ring CRYRING, will be back into operation in 2018 as the FAIR phase 0 with the goal to fulfill the needs of scientific community and the FAIR accelerators and detector development. Even though GSI has been well known for its operation of a variety of ion beams ranging from proton up to uranium for multi research areas such as nuclear physics, astrophysics, biophysics, material science, the upcoming beam time faces a number of challenges in re-commissioning its existing circular accelerators with brand new control system and upgrade of beam instrumentations, as well as in rising failures of dated components and systems. The cycling synchrotron SIS18 has been undergoing a set of upgrade measures for fulfilling future FAIR operation, among which many measures will also be commissioned during the upcoming beam time. This paper presents the highlights of the challenges such as re-establishing the high intensity heavy ion operation as well as parallel operation mode for serving multi users. The status of preparation including commissioning results will also be reported.  
slides icon Slides THYGBF3 [2.948 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THYGBF3  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)