Author: Shemyakin, A.V.
Paper Title Page
TUPAF076 Design of PIP-II Medium Energy Beam Transport 905
 
  • A. Saini, C.M. Baffes, A.Z. Chen, V.A. Lebedev, L.R. Prost, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The Proton Improvement Plan-II (PIP-II) is a proposed upgrade for the accelerator complex at Fermilab. The central piece of PIP-II is a superconducting radio frequency (SRF) 800 MeV linac capable of operating in both CW and pulse regimes. The PIP-II linac comprises a warm front-end that includes a H ion source capable of delivering 15-mA, 30-keV DC or pulsed beam, a Low Energy Beam Transport (LEBT), a 162.5 MHz, CW Radio-Frequency Quadrupole (RFQ) accelerating the ions to 2.1 MeV and, a 14-m Medium Energy Beam Transport (MEBT) before beam is injected into SRF part of the linac. This paper presents the PIP-II MEBT design and, discusses operational features and considerations that lead to existing optics design such as bunch by bunch chopping system, minimization of radiation coming to the warm front-end from the SRF linac using a concrete wall, a robust vacuum protection system etc.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF076  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF077 Beam Optics Measurements in Medium Energy Beam Transport at PIP-II Injector Test Facility 909
 
  • A. Saini, J.-P. Carneiro, B.M. Hanna, L.R. Prost, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
  • V.L. Sista
    BARC, Mumbai, India
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The Proton Improvement Plan-II Injector Test (PIP2IT) is an accelerator test facility under construction at Fermilab that will provide a platform to demonstrate critical technologies and concept of the front-end of the PIP-II linear accelerator (linac). The PIP2IT warm front-end comprises a H ion source capable of delivering 15 mA, 30 keV DC or pulsed beam, a Low Energy Beam Transport (LEBT), a 162.5 MHz, CW Radio Frequency Quadrupole (RFQ) that accelerates the beam to 2.1 MeV and, a 14 m medium energy beam transport (MEBT). Presently, beamline up to the MEBT has been commissioned and operates routinely at the PIP2IT facility. In this paper, we discuss beam measurements performed at the MEBT to analyze beam emittance and its RMS sizes along the MEBT. In addition, beam based calibration of the beamline elements using differential trajectory measurement is also presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF077  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYGBF2 PIP-II Injector Test Warm Front End: Commissioning Update 2943
 
  • L.R. Prost, R. Andrews, C.M. Baffes, J.-P. Carneiro, B.E. Chase, A.Z. Chen, E. Cullerton, P. Derwent, J.P. Edelen, J. Einstein-Curtis, D. Frolov, B.M. Hanna, D.W. Peterson, G.W. Saewert, A. Saini, V.E. Scarpine, A.V. Shemyakin, V.L. Sista, J. Steimel, D. Sun, A. Warner
    Fermilab, Batavia, Illinois, USA
  • C.J. Richard
    NSCL, East Lansing, Michigan, USA
  • V.L. Sista
    BARC, Mumbai, India
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test [1] at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
 
slides icon Slides THYGBF2 [2.434 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THYGBF2  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)