Paper | Title | Page |
---|---|---|
TUPAL037 | Installation Progress on FRIB β=0.041 Cryomodules Toward Beam Commissioning | 1087 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 The Facility for Rare Isotope Beams (FRIB) driver linac is to accelerate all the stable ion beams from proton to uranium beyond 200 MeV/u with beam powers up to 400 kW, which will be the first large-scale, CW SRF ion linac. The beam commissioning of the front end (from the ion source to the RFQ) already began and is in progress. The Accelerator Readiness Review (ARR) for beam through the first three β=0.041 cryomodules is scheduled for May 2018. The next step is the beam commissioning through the 12 SRF cavities housed in these 3 cryomodules with 6 superconducting solenoid magnets. The cryomodules and the adjacent warm diagnostics boxes in between have been already installed and aligned in the tunnel. This paper describes the installation progress of the β=0.041 cryomodules and plans for ARR02. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL037 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEXGBF3 | RF System for FRIB Accelerator | 1765 |
|
||
The RF system of the FRIB driver accelerator includes solid state amplifiers up to 18 kW operating at frequencies from 80.5 MHz to 322 MHz. Much higher power is required for the normal conducting RFQ, ~100 kW, and it is based on vacuum tubes. This invited talk presents the performance of solid state amplifiers and LLRF in off-line testing and on-line testing of the RFQ amplifier. | ||
![]() |
Slides WEXGBF3 [14.107 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEXGBF3 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |