Paper |
Title |
Page |
WEPAK004 |
Beam Instrumentation for CRYRING@ESR |
2084 |
|
- A. Reiter, C. Andre, H. Bräuning, C. Dorn, P. Forck, R. Haseitl, T. Hoffmann, W. Kaufmann, N. Kotovski, P. Kowina, K. Lang, R. Lonsing, P.B. Miedzik, T. Milosic, A. Petit, H. Reeg, C. Schmidt, M. Schwickert, T. Sieber, R. Singh, G. Vorobjev, B. Walasek-Höhne, M. Witthaus
GSI, Darmstadt, Germany
|
|
|
We present the beam instrumentation of CRYRING@ESR, a low-energy experiment facility at the GSI Helmholtz-Centre for heavy ion research. The 1.44 Tm synchrotron and storage ring, formerly hosted at the Manne Siegbahn laboratory in Stockholm, Sweden, was modified in its configuration and installed behind the existing ESR, the experimental storage ring. As the first machine within the ongoing FAIR project, the facility for antiproton and ion research, it is built on the future timing system and frameworks for data supply and acquisition. Throughout the past year CRYRING was commissioned including its electron cooler with hydrogen beams from the local linear accelerator. Storage, acceleration and cooling have been demonstrated. The contribution provides an overview of the beam instrumentation. The design of the detector systems and their current performance are presented. Emphasis is given to beam position monitors, detectors for intensity measurements, and the ionization profile monitors.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAK004
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPAK006 |
Bunch Shape Measurements at the GSI CW-Linac Prototype |
2091 |
|
- T. Sieber, W.A. Barth, P. Forck, V. Gettmann, M. Heilmann, H. Reeg, A. Reiter, S. Yaramyshev
GSI, Darmstadt, Germany
- F.D. Dziuba, T. Kürzeder, M. Miski-Oglu
HIM, Mainz, Germany
- A. Feschenko, S.A. Gavrilov
RAS/INR, Moscow, Russia
|
|
|
The existing GSI accelerator will become the injector for FAIR. To preserve and enhance the current experimental program at UNILAC, a new Linac is under development, which shall run in parallel to the FAIR injector, providing cw-beams of ions at energies from 3.5 - 7.3 MeV/u. For this cw-Linac a superconducting prototype cavity has been developed and was first operated with beam in summer 2017. The resonator is a cross-bar H-structure (CH) of 0.7 m length, with a resonant frequency of 216.8 MHz. It has been installed behind the GSI High Charge State Injector (HLI), which provided 108 MHz bunches of 1.4 MeV/u Ar6+/9+/11+ ions at a duty cycle of 25 %. Due to the frequency jump and small longitudinal acceptance of the CH, proper matching of the HLI beam to the prototype was required. The bunch properties of the injected beam as well as the effect of different phase- and amplitude-settings of the cavity were measured in detail with a bunch shape monitor (BSM) fabricated at INR, Moscow, while the mean energy was analyzed by time of flight method. In this contribution, the bunch shape measurements are described and the capabilities of the used BSM measurement principle are discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAK006
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THYGBF3 |
Challenges of FAIR Phase 0 |
2947 |
|
- M. Bai, A. Adonin, S. Appel, R. Bär, M.C. Bellachioma, U. Blell, C. Dimopoulou, G. Franchetti, O. Geithner, P. Gerhard, L. Groening, F. Herfurth, R. Hess, R. Hollinger, H.C. Hüther, H. Klingbeil, A. Krämer, S.A. Litvinov, F. Maimone, D. Ondreka, N. Pyka, S. Reimann, A. Reiter, M. Sapinski, B. Schlitt, G. Schreiber, M. Schwickert, D. Severin, R. Singh, P.J. Spiller, J. Stadlmann, M. Steck, R.J. Steinhagen, K. Tinschert, M. Vossberg, G. Walter, U. Weinrich
GSI, Darmstadt, Germany
|
|
|
After two-year's shutdown, the GSI accelerators plus the latest addition of storage ring CRYRING, will be back into operation in 2018 as the FAIR phase 0 with the goal to fulfill the needs of scientific community and the FAIR accelerators and detector development. Even though GSI has been well known for its operation of a variety of ion beams ranging from proton up to uranium for multi research areas such as nuclear physics, astrophysics, biophysics, material science, the upcoming beam time faces a number of challenges in re-commissioning its existing circular accelerators with brand new control system and upgrade of beam instrumentations, as well as in rising failures of dated components and systems. The cycling synchrotron SIS18 has been undergoing a set of upgrade measures for fulfilling future FAIR operation, among which many measures will also be commissioned during the upcoming beam time. This paper presents the highlights of the challenges such as re-establishing the high intensity heavy ion operation as well as parallel operation mode for serving multi users. The status of preparation including commissioning results will also be reported.
|
|
|
Slides THYGBF3 [2.948 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THYGBF3
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPAF077 |
Ion-optical Measurements at CRYRING@ESR during Commissioning |
3161 |
|
- O. Geithner, Z. Andelkovic, M. Bai, A. Bräuning-Demian, V. Chetvertkova, O. Chorniy, C. Dimopoulou, W. Geithner, O.E. Gorda, F. Herfurth, M. Lestinsky, S.A. Litvinov, S. Reimann, A. Reiter, M. Sapinski, R. Singh, T. Stöhlker, G. Vorobjev, U. Weinrich
GSI, Darmstadt, Germany
- A. Källberg
Stockholm University, Stockholm, Sweden
|
|
|
CRYRING@ESR is a heavy ion storage ring, which can cool and decelerate highly charged ions down to a few 100 keV/u. It has been relocated from Sweden to GSI, downstream of the experimental storage ring (ESR), within the FAIR project. The ring will be used as a test facility for FAIR technologies as well as for physics experiments with slow exotic ion beams for several FAIR collaborations: SPARC, BioMat, FLAIR and NUSTAR. CRYRING@ESR is in its commissioning phase since summer 2016. Several ion-optical measurements such as tunes, tune diagram, dispersion, chromaticity and orbit response matrix were performed at the ring. The measurements will be used for several purposes such as improvement of the theoretical model, closed orbit control and correction of unacceptable misalignments, calibration coefficients and field errors.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAF077
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|