Paper |
Title |
Page |
TUPAF063 |
Beam Dynamics Studies of the ESS LINAC Using a New Multicell Cavity Model |
870 |
|
- R. De Prisco, D.C. Plostinar
ESS, Lund, Sweden
|
|
|
The European Spallation Source is designed to deliver 5 MW proton beam power on the target while keeping the beam induced losses below 1 W/m throughout the LINAC. This implies the need of accurate models to correctly describe the longitudinal beam dynamics within the multi-cell cavities. In all the previous error studies the cells of a multi-cell cavity were modelled as a sequence of independent gaps and the errors were applied directly on the amplitude of each cell accelerating field, considered as random variable. In this paper, instead, we present a new detailed analysis of the effect of the error tolerances on the beam dynamics including a new model to calculate the amplitude errors of the accelerating field in the multi-cell cavities: errors are applied on the geometrical parameters of each cavity; then the accelerating field is calculated solving the Maxwell equations over all the cavity.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF063
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF064 |
Preparation Towards the Ess Linac Ion Source and Lebt Beam Commissioning on Ess Site |
874 |
|
- R. Miyamoto, M. Eshraqi, A. Jansson, E. Laface, Y. Levinsen, Ø. Midttun, N. Milas, M. Muñoz, D.C. Plostinar, A. Ponton, E. Sargsyan, L. Tchelidze
ESS, Lund, Sweden
- L. Celona, L. Neri
INFN/LNS, Catania, Italy
- W. Ledda
Vitrociset s.p.a, Roma, Italy
|
|
|
Beam commissioning of the proton linac of the European Spallation Source begin in summer, 2018, from the ion source (IS) and low energy beam transport (LEBT), and continues in stages until 2022, when the first beam is sent to its spallation target. This paper presents the plan, status, and highlights of preparation works for the upcoming IS and LEBT beam commissioning.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF064
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF065 |
Opportunities and Challenges in Planning the Installation, Testing and Commissioning of Large Accelerator Facilities |
878 |
|
- D.C. Plostinar, D. Bergenholtz, H. Danared, L. Gunnarsson, M.I. Israelsson, A. Jansson, M. Lindroos, A. Sunesson, L. Tchelidze, J.G. Weisend
ESS, Lund, Sweden
|
|
|
Delivering major accelerator facilities requires complex project preparation, organisation and scheduling. Often, multiple factors have to be taken into account including technical, financial and political. This makes planning particularly difficult, but at the same time opens opportunities for improving and optimising the project prospects. In this paper, we discuss the major drivers governing the installation, testing and commissioning of major accelerators in general, with particular emphasis on the European Spallation Source (ESS) accelerator, currently under construction in Lund, Sweden.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF065
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF066 |
Transverse Dynamics and Software Integration of the ESS Low Energy Beam Transport |
882 |
|
- N. Milas, K.S. Louisy, D.C. Plostinar
ESS, Lund, Sweden
|
|
|
The first part of the ESS linac, also called front-end, comprising the Ion Source and the Low Energy Beam Transport (LEBT) section, will be installed and commissioned in 2018. The LEBT is used to focus and correct the proton beam trajectory and clean the head and tail of the proton pulse from the flat top before entering the RFQ. During the ion source and LEBT commissioning a full beam characterization at the RFQ entrance interface is planned. It is thus important to have an application in the control room able to display quantities measured by the diagnostic devices and also to quickly run a simulation including not only centre of mass dynamics but also envelope. This paper presents the efforts in modelling the LEBT elements, as accurately as possible, and implementing the dynamics calculation and integration with diagnostics tools. The final result is a Java FX GUI based on the OpenXAL library.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF066
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|