Author: Peng, M.M.
Paper Title Page
THPAL150 Development of Tsinghua X-Band High Power Test Facility 3999
 
  • M.M. Peng, D.Z. Cao, W. Gai, Y.L. Jiang, J. Liu, J. Shi, P. Wang
    TUB, Beijing, People's Republic of China
 
  The X band high power test facility consists of a 11.424 GHz, 50 MW CPI klystron and a ScandiNova pulse modulator at Tsinghua University has been built since Sept 2017 and the output RF power has reached 60 MW with 200 ns pulse width at a repetition frequency of 10. The klystron output RF pulse will eventually be 50 MW at a 1.5 μs. A group of cylinder pulse compressor will be installed. High gradient accelerating structures for research and TTX will be tested on this facility.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL150  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAL158 Development of an Half-Cell Accelerating Structure in Tsinghua 4023
 
  • M.M. Peng, W. Gai, J. Shi, Z.H. Wang, H. Zha
    TUB, Beijing, People's Republic of China
 
  The half-cell high gradient accelerating structure is attractive for its easy manufacturing and good alignment. A structure with 12 cells has been designed for the frequency of 11.424 GHz and a cold test will be conducted. Two different mechanical factory manufacture with same machining drawing and the results will be compared.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL158  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)