Identification and Removal of SPS Aperture Limitations |
709 |
|
- V. Kain, R. Alemany-Fernández, H. Bartosik, S. Cettour Cave, K. Cornelis, P. Cruikshank, J.A. Ferreira Somoza, B. Goddard, C. Pasquino
CERN, Geneva, Switzerland
|
|
|
The CERN SPS (Super Proton Synchrotron) serves as LHC injector and provides beam for the North Area fixed target experiments. Since the 2016 run automated local aperture scans have been performed with the main focus on the vertical plane where limitations typically arise due to the flat vacuum chambers in most SPS elements. For LHC beams the aperture limitations with the present low integer tune optics also occur at locations with large dispersion. Aperture measurements in the horizontal plane using a variety of techniques were performed and showed surprising results, which could partially explain the unexpected losses of high intensity LHC beams at the SPS flat bottom. In this paper, reference measurements from 2016 are compared with the ones taken at the beginning of the run in 2017. Several aperture restrictions in the vertical plane could be found and cured, and a potential systematic restriction in the horizontal plane has been identified. The results of the measurements and the origin of the restrictions are presented in this paper, and the outlook for partial mitigation is discussed.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF021
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMF087 |
LHC Injectors Upgrade Project: Outlook of the Modifications to the Super Proton Synchrotron (SPS) Vacuum System and Impact on the Operation of the Carbon-Coated Vacuum Chambers |
2589 |
|
- C. Pasquino, G. Bregliozzi, P. Chiggiato, P. Cruikshank, A. Farricker, A. Harrison, J. Perez Espinos, J.A.F. Somoza, M. Taborelli, C. Vollinger
CERN, Geneva, Switzerland
|
|
|
Aiming at doubling the beam intensity and reducing the beam emittance, significant modifications of the LHC and its injector chain will take place during Long Shutdown 2 (LS2), starting from 2019. The LIU project (LHC Injector Upgrade), in the specific, touches Linac4, the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS), the Super Proton Synchrotron (SPS) as well as the heavy ion chain. During LS2, important changes will take place mainly in the Long Straight Sections of the SPS to host a newly conceived dumping system, upgraded RF cavities and upgraded extraction channels. Additionally, the vacuum chambers of the main bending and focusing magnets as well as vacuum drifts will be coated with amorphous carbon in order to reduce the dynamic pressure effects induced by multipacting. The modifications to the different vacuum sectors will be described in details as well as the impact on operation of amorphous carbon coated sectors that have been already deposited.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF087
|
|