Particle bunches traveling in a ring can excite wakefields inside any radio-frequency element present. These electromagnetic modes can resonate long enough and interact with subsequent passing bunches. A coherent oscillation between bunches can quickly become an instability and needs to be addressed. The Jefferson Lab electron ion collider has a large 50 mrad crossing angle and thus relies on bunch crabbing to achieve high luminosity. Bunch crabbing is done with compact superconducting rf dipole cavities. We study coupled bunch oscillations driven by the higher order modes of multicell RFD crab cavities under study for JLEIC, we calculate the instability growth time assuming a symmetric beam spectrum, identify the HOMs driving the instability and discuss mitigation measures. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAK070 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL067 | Room Temperature Measurements of Higher Order Modes for the SPS Prototype RF-Dipole Crabbing Cavity | 3805 |
|
||
LHC High Luminosity Upgrade will be developing two local crabbing systems to increase the luminosity of the colliding bunches at the ATLAS and CMS experiments. One of the crabbing systems uses the rf-dipole cavity design that will be crabbing the beam in the horizontal plane. The fully integrated crabbing cavity has two higher order mode couplers in damping those excited modes. Currently two sets of HOM couplers have been fabricated at Jefferson Lab for prototyping and testing with the LARP crabbing cavities. This paper presents the measurements of the higher order modes with the prototype HOM couplers carried out at room temperature. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL067 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL140 | Rework Recipe Development, Analysis and Results of Select 9-Cell Cavities for LCLS-II | 3968 |
|
||
Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are collaborating in this project. The cryomodules for this project each consist of eight 1.3-GHz cavities produced by two vendors, Research Instruments GmbH in Germany (RI*) and Ettore Zanon S.p.a. in Italy (EZ*), using niobium cell material from Tokyo Denkai Co., Ltd. (TD) and Ningxia Orient Tantalum Industry Co., Ltd. (OTIC/NX)). During the initial production run, cavity performance from one of the vendors (Vendor A) was far below expectation. All the cavities had low Q0, later attributed to minimal EP as well as high-flux-trapping NX material, early quench behaviour below 18 MV/m, with many having Q0 roll-off at 12-16 MV/m. Production was stopped multiple times over the following 6 months, with test batches of cavities being made to ascertain the root cause of the problem. The final root cause of the problem was found to be inappropriate grinding of the RF surface prior to welding which left normal conducting inclusions in the surface. In addition, most cavities showed internal and external weld spatter which required post weld grinding and a very rough surface from operating the electropolishing machine in an etching rather than polishing regime. All issues have been corrected on new cavities and rework is underway on the originally effected cavities. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL140 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPAL141 | Optimizing Procurement Strategies for LCLS-II | 3972 |
|
||
Funding: This work was supported by the LCLS-II Project and the U.S. Department of Energy, Contract DE-AC02-76SF00515 The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab), are participating in this project. JLab is responsible for procuring a number of critical components. Over the course of this project, JLab has evolved several procurement strategies to minimize risk and improve performance while working within the constraints of budget and schedule. This paper discusses the impact of procurement choices on project technical success. |
||