TUPAL046 | Construction, Test, and Operation of a new RFQ at the Spallation Neutron Source (SNS) | 1113 |
|
||
Funding: * This work was supported by SNS through UT-Battelle, LLC, under contract DEAC0500OR22725 for the U.S. DOE. A new RFQ was successfully installed recently in the SNS linac to replace the old RFQ that was used for more than a decade with certain operational limitations. The new RFQ was completely tested with H− ion source in the Beam Test Facility (BTF) at SNS. For robust operation of SNS at 1.4 MW, the full design beam power and to satisfy the beam current requirement of the forthcoming SNS proton power upgrade (PPU) project, an RFQ with enhanced performance and reliability was needed. The new RFQ was built to have the beam parameters identical to those of the first RFQ but with improved RF and mechanical stability and reliability for continuous operation of neutron production. The tests confirmed that the new RFQ can run with high beam transmission efficiency at around 90 % and notably improved operational stability. In this paper, construction, test, installation, and operation of the new RFQ in SNS are discussed with the performance improvements. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL046 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAL049 | SNS Proton Power Upgrade Status | 1120 |
|
||
Funding: ORNL is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. DOE. This research was supported by the DOE Office of Science, Basic Energy Science, Scientific User Facilities. The Spallation Neutron Source (SNS) Proton Power Upgrade (PPU) project aims to double the proton accelerator beam power from 1.4 to 2.8 MW. Over the past year PPU has completed the reviews necessary for Critical Decision-1 approval. The baseline design choices are being refined, and a cost-effective approach has been identified. The beam energy will be increased by 30% and the beam current capability improved by ~50%. The sub-system improvements and anticipated schedule will be discussed. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL049 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |