Paper | Title | Page |
---|---|---|
WEXGBF1 | Testing of the ESS MB-IOT Prototypes | 1759 |
|
||
ESS is considering the use of MB-IOTs for parts of the high-beta linac. Two prototypes have been built by indus-try, namely L3 and CPI/Thales and have passed the factory acceptance test with excellent results. Both tubes will go through further extensive testing at CERN for ESS follow-ing delivery and a final decision on tube technology will be taken in April 2018. This invited talk presents the back-ground for the technical decision of IOTs vs klystrons, associated impact for ESS, and latest plans for industrial production of these IOTs for ESS. | ||
![]() |
Slides WEXGBF1 [9.836 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEXGBF1 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPML053 | Availability of the TiN Coating-Free Ceramic in the STF-type Power Coupler for ILC | 2819 |
|
||
In the Superconducting RF Test Facility (STF) in KEK, the research and development for the power coupler with the TiN coating-free ceramic has been done from 2014. In 2016, the high power test at the test bench was stopped due to the worse vacuum level by the unusual heating around the RF window with the TiN coating-free ceramic and the coaxial tapered section, which was caused by the enormous emission of the secondary electrons from the ceramic. And, the situation was never also changed by the ultrapure water rinsing for the power couplers several times. However, in 2017, the ultrasonic rinsing was done for the power couplers for the first time by the collaboration between KEK and TETD. After that, the situation was drastically improved, and the secondary electron emission almost disappeared even in the higher RF duty. This shows that the TiN coating-free ceramic is the prospective item for the cost reduction in ILC. In this report, the recent result for the power coupler with the TiN coating-free ceramic will be presented in detailed. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML053 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPMK105 | PERLE - Lattice Design and Beam Dynamics Studies | 4556 |
|
||
Funding: Work has been authored by Jefferson Science Associates, LLC under Contract No. DE-AC05-06OR23177 with the U.S. Department of Energy. PERLE (Powerful ERL for Experiments) is a novel ERL test facility, initially proposed to validate choices for a 60 GeV ERL foreseen in the design of the LHeC and the FCC-eh. Its main thrust is to probe high current, CW, multi-pass operation with superconducting cavities at 802 MHz (and perhaps testing other frequencies of interest). With very high virtual beam power (~ 10 MW), PERLE offers an opportunity for controllable study of every beam dynamic effect of interest in the next generation of ERL design; becoming a ‘stepping stone' between present state-of-art 1 MW ERLs and future 100 MW scale applications. PERLE design features Flexible Momentum Compaction lattice architecture for six vertically stacked return arcs and a high-current, 6 MeV, photo-injector. With only one pair of 4 cavity cryomodules, 400 MeV beam energy can be reached in 3 re-circulation passes, with beam currents in excess of 15 mA. The beam is decelerated in 3 consecutive passes back to the injection energy, transferring virtually stored energy back to the RF. This unique facility will serve as a test-bed for high current ERL technologies, as well as a user facility in low energy electron and photon physics. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMK105 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |