Paper |
Title |
Page |
MOPMF034 |
Layout and Performance of the FCC-ee Pre-Injector Chain |
169 |
|
- S. Ogur, T.K. Charles, K. Oide, Y. Papaphilippou, L. Rinolfi, F. Zimmermann
CERN, Geneva, Switzerland
- A.M. Barnyakov, A.E. Levichev, P.V. Martyshkin, D.A. Nikiforov
BINP SB RAS, Novosibirsk, Russia
- I. Chaikovska, R. Chehab
LAL, Orsay, France
- K. Furukawa, N. Iida, T. Kamitani, F. Miyahara
KEK, Ibaraki, Japan
- E.V. Ozcan
Bogazici University, Bebek / Istanbul, Turkey
- S.M. Polozov
MEPhI, Moscow, Russia
|
|
|
The Future Circular e+e− Collider pre-injector chain consists of a 6 GeV S-Band linac, a damping ring at 1.54 GeV and pre-booster ring to reach 20 GeV for injection to the main booster. The electron and positron beams use the same accelerator chain alternatively. The e+ beam is generated from a novel low level RF-gun providing 6.5 nC charge at 11 MeV with 0.5 micron geometric emittance. The e+ beam is produced by the impact of a 4.46 GeV e- beam onto a hybrid target, accelerated in the linac up to 1.54 GeV, and injected to the damping ring for emittance cooling. Simulations on the performance of the DR are presented for reaching the required equilibrium emittances at the required damping time. As an alternative option, a 20 GeV linac is considered utilising C-Band cavities and simulations studies have been undertaken regarding the beam transport and transmission efficiency up to that energy.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF034
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPMF073 |
Rejuvenation of 7-Gev SuperKEKB Injector Linac |
300 |
|
- K. Furukawa, M. Akemoto, D.A. Arakawa, Y. Arakida, H. Ego, A. Enomoto, Y. Enomoto, T. Higo, H. Honma, N. Iida, M. Ikeda, H. Kaji, K. Kakihara, T. Kamitani, H. Katagiri, M. Kawamura, M. Kurashina, S. Matsumoto, T. Matsumoto, H. Matsushita, S. Michizono, K. Mikawa, T. Miura, F. Miyahara, H. Nakajima, K. Nakao, T. Natsui, M. Nishida, Y. Ogawa, Y. Ohnishi, S. Ohsawa, F. Qiu, I. Satake, M. Satoh, Y. Seimiya, A. Shirakawa, H. Sugimura, T. Suwada, T. Takenaka, M. Tanaka, N. Toge, Y. Yano, K. Yokoyama, M. Yoshida, R. Zhang, X. Zhou
KEK, Ibaraki, Japan
|
|
|
KEK injector linac has delivered electrons and positrons for particle physics and photon science experiments for more than 30 years. It was upgraded for the SuperKEKB project, which aims at a 40-fold increase in luminosity over the previous project KEKB, in order to increase our understanding of flavor physics beyond the standard model of elementary particle physics. SuperKEKB energy-asymmetric electron-positron collider with its extremely high luminosity requires a high current, low emittance and low energy spread injection beam from the injector. The electron beam is generated by a new type of RF gun, that provides a much higher beam current to correspond to a large stored beam current and a short lifetime in the ring. The positron source is another major challenge that enhances the positron bunch intensity from 1 to 4 nC by increasing the positron capture efficiency, and the positron beam emittance is reduced from 2000 μm to 10 μm in the vertical plane by introducing a damping ring, followed by the bunch compressor and energy compressor. The summary of the rejuvenation is reported.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF073
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPMF045 |
Synchronized Beam Position Measurement for SuperKEKB Injector Linac |
4159 |
|
- M. Satoh, F. Miyahara, T. Suwada
KEK, Ibaraki, Japan
- T. Kudou, S. Kusano
Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
- T. Ohfusa, H.S. Saotome, M. Takagi
Kanto Information Service (KIS), Accelerator Group, Ibaraki, Japan
|
|
|
Toward SuperKEKB project, the injector linac upgrade is ongoing for aiming at the stable beam operation with low emittance and high intensity bunch charge. One of the key challenges is a low emittance preservation of electron beam because the vertical emittance of 20 mm.mrad or less should be transported to the main ring without a damping ring. For this purpose, the fine alignment of accelerator components is a crucial issue since the linac alignment was badly damaged by the big earthquake in 2011. From the simulation results of emittance growth, the alignment of the quadrupole magnets and accelerating structures should be conducted at the level of 300 um in rms along the 600-m-long linac. In addition, we are aiming at the level of 100 um alignment in rms within the short range distance of 100 m long. Even after the fine component alignment can be achieved, the fine beam orbit manipulation is necessary for low emittance preservation. For these reasons, we have developed the new BPM readout system based on VME64x. The new system has improved the precision of beam position measurement up to 3 um from 25 um. We will describe the software development of the new BPM readout system.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF045
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|