Author: Midttun, O.     [Midttun, Ø.]
Paper Title Page
TUPAF064 Preparation Towards the Ess Linac Ion Source and Lebt Beam Commissioning on Ess Site 874
 
  • R. Miyamoto, M. Eshraqi, A. Jansson, E. Laface, Y. Levinsen, Ø. Midttun, N. Milas, M. Muñoz, D.C. Plostinar, A. Ponton, E. Sargsyan, L. Tchelidze
    ESS, Lund, Sweden
  • L. Celona, L. Neri
    INFN/LNS, Catania, Italy
  • W. Ledda
    Vitrociset s.p.a, Roma, Italy
 
  Beam commissioning of the proton linac of the European Spallation Source begin in summer, 2018, from the ion source (IS) and low energy beam transport (LEBT), and continues in stages until 2022, when the first beam is sent to its spallation target. This paper presents the plan, status, and highlights of preparation works for the upcoming IS and LEBT beam commissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF064  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAF087 The First Experience and Results of Beam Diagnostics Deployment at the ESS Accelerator 2054
 
  • V. Grishin, E.C. Bergman, B. Cheymol, C.S. Derrez, T.J. Grandsaert, H. Hassanzadegan, A. Jansson, H. Kocevar, Ø. Midttun, S. Molloy, J. Norin, T.J. Shea, C.A. Thomas
    ESS, Lund, Sweden
  • W. Ledda
    Vitrociset s.p.a, Roma, Italy
  • F. Senée, O. Tuske
    CEA/IRFU, Gif-sur-Yvette, France
 
  The European Spallation Source (ESS) will produce neutrons for science by subjecting a tungsten target to the high-intensity proton beam from a superconducting linear accelerator. A complete suite of beam diagnostics will enable tuning, monitoring and protection of the accelerator during commissioning, studies and operation. As an initial step toward neutron production, the Ion Source and the 75 keV Low Energy Transport Line is installed on the ESS site in Lund, Sweden. To support the commissioning and characterization of this first beam-producing system, a subset of the full diagnostics suite is deployed. This includes the following equipment: a faraday cup, current transformers, an emittance measurement unit, beam-induced fluorescence monitors, and a doppler-shift spectroscopy system. All aspects of the deployment experience, from acceptance testing through installation, verification, and commissioning will be presented.
*Beam Instrumentation
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAF087  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)