Author: Michels, O.
Paper Title Page
TUPAF035 Observations of SPS Slow-Extracted Spill Quality Degradation and Possible Improvements 761
 
  • F.M. Velotti, H. Bartosik, K. Cornelis, M.A. Fraser, B. Goddard, S. Hirlaender, V. Kain, O. Michels, M. Pari
    CERN, Geneva, Switzerland
 
  The SPS delivers slow extracted proton and heavy ion spills of several seconds to the North Area fixed target experiments with a very high duty factor. Reduced machine reproducibility due to magnetic history and power supply ripples on the main circuits lead however to frequent degradation of the spill duty factor. In this paper, the measured effect of the SPS magnetic history on spill quality and principal machine parameters is presented. Another detailed measurement campaign was aimed at characterising the frequency content and response of the spill to noise on the main power supplies ripples. The main findings of this study will also be reported. Finally, simulations of possible improvements based on the data acquired are discussed, as well as an extrapolation to the possible spill quality after the implementation of the improvements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF035  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAL062 The New 20 kA 80 V Power Supply for the 520 MeV H Cyclotron at TRIUMF 3792
 
  • S. Carrozza, L. Bondesan, A. Morato, M.P. Pretelli, G.T. Taddia
    OCEM, Valsamoggia, Italy
  • M.C. Bastos, J.-P. Burnet, G. Hudson, Q. King, G. Le Godec, O. Michels
    CERN, Geneva, Switzerland
  • Y. Bylinskii, A.C.M. Leung, W. L. Louie, F. Mammarella, R.B. Nussbaumer, C. Valencia
    TRIUMF, Vancouver, Canada
 
  The new 20 kA, 80 V power supply for the main magnet of the 520 MeV H Cyclotron at TRIUMF was awarded to OCEM. It has replaced the original system (commissioned in 1976) based on a series pass regulator. The final acceptance tests have demonstrated the com-pliance with the project specifications, especially for the high current stability required for the Cyclotron operation. The current stability is ±5 ppm, including current ripple, for a period of more than 8 hours of continuous operation. In addition, the magnetic field can be further stabilized us-ing feedback of a flux loop signal. OCEM designed the power supply to use the third gen-eration of Function Generator/Controller (FGC3) control electronics from CERN. This was chosen to obtain the high current stability required by TRIUMF. This collaboration was facilitated through a Knowledge Transfer agreement between CERN and OCEM. The power supply commis-sioning has been performed as a collaboration between OCEM, TRIUMF and CERN. This paper describes the topology of the power supply, the control electronics, the high-precision current measure-ment system and the associated software as well as the commissioning results carried out with the magnet.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL062  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)