Paper | Title | Page |
---|---|---|
THPAL137 | Acceptance Testing of the First Group of LCLS II Cryomodules at Jefferson Lab | 3965 |
|
||
Funding: This work was supported by the LCLS-II Project and the US Department of Energy, Contract DE-AC02-76SF00515. The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other Department of Energy (DOE) national laboratories, The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other Department of Energy (DOE) national laboratories, in the Linac Co-herent Light Source II project (LCLS II). The SRF Insti-tute at Jefferson Lab is currently building 17 cryomod-ules for this project. The cryomodules are TESLA style cryomodules that have been modified for continuous wave (CW) operation and for other LCLS II specifica-tions. Each cryomodule contains eight 9-cell cavities with coaxial power couplers operating at 1.3 GHz. The cryomodules also contains a magnet package that con-sists of a quadrupole and two correctors. These cryomod-ules will be tested in the Cryomodule Test Facility (CMTF) at Jefferson Lab before shipment to the Stanford Linear Accelerator (SLAC). Acceptance testing of the LCLS II cryomodules began in December 2016. Seven cryomodules have currently completed Acceptance test-ing. This paper will summarize the results of those tests. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL137 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |