Author: Maurice, L.
Paper Title Page
WEPMK015 Optimization of Vertical Electro-Polishing Process: Experiments with Updated Cathode on Single-Cell Cavity and Performance Achieved in Vertical Test 2662
 
  • F. Éozénou, L. Maurice
    CEA/DSM/IRFU, France
  • P. Carbonnier, C. Madec, Th. Proslier, C. Servouin
    CEA/DRF/IRFU, Gif-sur-Yvette, France
  • V. Chouhan, Y.I. Ida, K.N. Nii, T.Y. Yamaguchi
    MGH, Hyogo-ken, Japan
  • H. Hayano, S. Kato, H. Monjushiro, T. Saeki, M. Sawabe
    KEK, Ibaraki, Japan
 
  Marui Galvanizing Co.Ltd., and CEA have been studying Vertical Electro-Polishing (VEP) on Nb single-cell accelerating superconducting accelerator cavity with the goal of mass-production and cost-reduction, in collaboration with KEK within TYL-FJPPL Particle Physics Laboratory. Marui has invented and patented a rotative cathode called ‘i-Ninja'. The version 5 has been tested for the first time in Europe at CEA Saclay. The four wings of the cathode remove efficiently, bubbles of hydrogen, and the chosen parameters make it possible to achieve better surface and uniform material removal compared to VEP with a fixed cathode. The effect of the temperature of the cavity walls on current oscillations has been precisely studied. Two single-cell cavities have been electro-polished and tested at 2 K in vertical cryostat and the results will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMF004 The Saclay Test Stand for Conditioning the ESS RFQ Power Couplers at High RF Power 2375
 
  • N. Misiara, A.C. Chauveau, D. Chirpaz-Cerbat, P. Daniel-Thomas, M. Lacroix, L. Maurice
    CEA/IRFU, Gif-sur-Yvette, France
  • M. Desmons, A. Dubois, A. Gaget, L. Napoly, M. Oublaid, G. Perreu, O. Piquet, B. Pottin, Y. Sauce
    CEA/DRF/IRFU, Gif-sur-Yvette, France
 
  The RF power coupler system for the RFQ of the ESS LINAC will feed 1.6 MW peak power through two coaxial loop couplers for a 352.21 MHz operation at the expected duty cycle. A specific test stand has been designed to condition the power couplers, and test the different auxiliary components in the nominal conditions of the RFQ. The power couplers were successfully assembled, installed and instrumented on the test cavity. This paper presents the general layout of the test stand, the installation and preparation of the power couplers for their conditioning at high RF power up to the ESS nominal conditions.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)