Paper |
Title |
Page |
WEPMK015 |
Optimization of Vertical Electro-Polishing Process: Experiments with Updated Cathode on Single-Cell Cavity and Performance Achieved in Vertical Test |
2662 |
|
- F. Éozénou, L. Maurice
CEA/DSM/IRFU, France
- P. Carbonnier, C. Madec, Th. Proslier, C. Servouin
CEA/DRF/IRFU, Gif-sur-Yvette, France
- V. Chouhan, Y.I. Ida, K.N. Nii, T.Y. Yamaguchi
MGH, Hyogo-ken, Japan
- H. Hayano, S. Kato, H. Monjushiro, T. Saeki, M. Sawabe
KEK, Ibaraki, Japan
|
|
|
Marui Galvanizing Co.Ltd., and CEA have been studying Vertical Electro-Polishing (VEP) on Nb single-cell accelerating superconducting accelerator cavity with the goal of mass-production and cost-reduction, in collaboration with KEK within TYL-FJPPL Particle Physics Laboratory. Marui has invented and patented a rotative cathode called ‘i-Ninja'. The version 5 has been tested for the first time in Europe at CEA Saclay. The four wings of the cathode remove efficiently, bubbles of hydrogen, and the chosen parameters make it possible to achieve better surface and uniform material removal compared to VEP with a fixed cathode. The effect of the temperature of the cavity walls on current oscillations has been precisely studied. Two single-cell cavities have been electro-polished and tested at 2 K in vertical cryostat and the results will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK015
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAK015 |
The SARAF-LINAC Project 2018 Status |
994 |
|
- N. Pichoff, D. Chirpaz-Cerbat, R. Cubizolles, J. Dumas, R.D. Duperrier, G. Ferrand, B. Gastineau, P. Gastinel, F. Gougnaud, M. Jacquemet, C. Madec, Th. Plaisant, F. Senée, A. Sutra-Fourcade, D. Uriot
IRFU, CEA, University Paris-Saclay, Gif-sur-Yvette, France
- D. Berkovits, J. Luner, A. Perry, E. Reinfeld, J. Rodnizki
Soreq NRC, Yavne, Israel
- M. Di Giacomo
GANIL, Caen, France
|
|
|
SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC Solenoid-Package are under construction and their test stands construction or adaptation is in progress at Saclay. Meanwhile, the cryomodules and the global system just passed their Critical Design Reviews. This paper presents the status of the SARAF-LINAC Project at April 2018.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK015
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|