Author: Madec, C.
Paper Title Page
WEPMK015 Optimization of Vertical Electro-Polishing Process: Experiments with Updated Cathode on Single-Cell Cavity and Performance Achieved in Vertical Test 2662
 
  • F. Éozénou, L. Maurice
    CEA/DSM/IRFU, France
  • P. Carbonnier, C. Madec, Th. Proslier, C. Servouin
    CEA/DRF/IRFU, Gif-sur-Yvette, France
  • V. Chouhan, Y.I. Ida, K.N. Nii, T.Y. Yamaguchi
    MGH, Hyogo-ken, Japan
  • H. Hayano, S. Kato, H. Monjushiro, T. Saeki, M. Sawabe
    KEK, Ibaraki, Japan
 
  Marui Galvanizing Co.Ltd., and CEA have been studying Vertical Electro-Polishing (VEP) on Nb single-cell accelerating superconducting accelerator cavity with the goal of mass-production and cost-reduction, in collaboration with KEK within TYL-FJPPL Particle Physics Laboratory. Marui has invented and patented a rotative cathode called ‘i-Ninja'. The version 5 has been tested for the first time in Europe at CEA Saclay. The four wings of the cathode remove efficiently, bubbles of hydrogen, and the chosen parameters make it possible to achieve better surface and uniform material removal compared to VEP with a fixed cathode. The effect of the temperature of the cavity walls on current oscillations has been precisely studied. Two single-cell cavities have been electro-polished and tested at 2 K in vertical cryostat and the results will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK015 The SARAF-LINAC Project 2018 Status 994
 
  • N. Pichoff, D. Chirpaz-Cerbat, R. Cubizolles, J. Dumas, R.D. Duperrier, G. Ferrand, B. Gastineau, P. Gastinel, F. Gougnaud, M. Jacquemet, C. Madec, Th. Plaisant, F. Senée, A. Sutra-Fourcade, D. Uriot
    IRFU, CEA, University Paris-Saclay, Gif-sur-Yvette, France
  • D. Berkovits, J. Luner, A. Perry, E. Reinfeld, J. Rodnizki
    Soreq NRC, Yavne, Israel
  • M. Di Giacomo
    GANIL, Caen, France
 
  SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC Solenoid-Package are under construction and their test stands construction or adaptation is in progress at Saclay. Meanwhile, the cryomodules and the global system just passed their Critical Design Reviews. This paper presents the status of the SARAF-LINAC Project at April 2018.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)