Beam Commissioning of the 750 MHz Proton RFQ for the LIGHT Prototype |
658 |
|
- V.A. Dimov, M. Caldara, A. Degiovanni, L.S. Esposito, D.A. Fink, M. Giunta, A. Jeff, A. Valloni
AVO-ADAM, Meyrin, Switzerland
- A.M. Lombardi, S.J. Mathot, M. Vretenar
CERN, Geneva, Switzerland
|
|
|
ADAM (Application of Detectors and Accelerators to Medicine), a CERN spin-off company, is developing the Linac for Image Guided Hadron Therapy, LIGHT, which will accelerate proton beams up to 230 MeV. The design of the linac will allow fast intensity and energy modulation for pencil-beam scanning during cancer treatment. The linac consists of a 40 keV Proton Injector; a 750 MHz Radio Frequency Quadrupole (RFQ) accelerating the proton beam up to 5 MeV; a 3 GHz Side Coupled Drift Tube Linac (SCDTL) up to 37.5 MeV; and a 3 GHz Cell Coupled Linac (CCL) section up to 230 MeV. A prototype of LIGHT is being commissioned progressively with the installation of the accelerating structures at a CERN site. The beam commissioning of the RFQ, which was designed and built by CERN, was completed in 2017 using a movable beam diagnostic test bench with various instruments. This paper reports on the RFQ commissioning strategy and the results of the beam measurements.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF002
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF086 |
Adaption of the HSI -RFQ Rf-Properties to an Improved Beam Dynamics Layout |
938 |
|
- M. Vossberg, L. Groening, S. Mickat, H. Vormann, C. Xiao
GSI, Darmstadt, Germany
- V. Bencini, J.M. Garland, J.-B. Lallement, A.M. Lombardi
CERN, Geneva, Switzerland
|
|
|
The GSI accelerator facility comprising the linear accelerator UNILAC and the synchrotron SIS18 will be used in future mainly as the injector for the Facility for Anti-Proton and Ion Research (FAIR) being under construction. FAIR requires high beam brilliance and the UNILAC's RFQ electrodes must be upgraded with respect to their beam dynamics design. The new layout is currently being conducted at CERN with the aim of adjusting the electrode voltage according to the design voltage of 123 kV. CST simulations performed at GSI assure that the resonance frequency with the new electrode geometry is recuperated through corrections of the carrier rings. Simulations on the frequency dependence of the rings shapes and their impact on the voltage distribution along the RFQ are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF086
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|