Paper |
Title |
Page |
THPAL050 |
Beam Dynamics of the First Beams for the IFMIF-EVEDA RFQ Commissioning |
3754 |
|
- C.S. Chen, W.S. Chan, Y.Y. Cheng, Y.-C. Chung, C.Y. Liu, Y.-H. Liu, Z.-D. Tsai
NSRRC, Hsinchu, Taiwan
|
|
|
Since December 31th 2014, the first synchrotron light from Taiwan Photon Source (TPS) was stored in the storage ring, the challenge to operate both Taiwan Light Source (TLS) and TPS smoothly and reliably became a significant issue for all members in NSRRC. On the one hand, the beam quality of former TLS must not been impaired due to the occupied resources by TPS, on the other hand, the most efforts were devoted to achieving steady operation of TPS. In order to operate both ring stably, some mutual backup structures were designed in the compressed air system and the chilled water system between TLS and TPS. The primary advantage of these mutual backup systems is minimizing the risk of beam-trip while any one of the utility system fails. Secondly, the mutual backup structures provide more flexible usage to accomplish energy conservation. From both risk-reduction and energy conservation points of view, the backup systems will do a great deal of good in the future.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL050
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPAL051 |
The Data Acquisition on Vibration Evaluation for Ice Water Pumps Systems in TPS |
3757 |
|
- Y.-H. Liu, C.-S. Chen, Y.-C. Chung, Z.-D. Tsai
NSRRC, Hsinchu, Taiwan
|
|
|
The vibration status is a critical problem for the utility system, especially for those continuously operate deionized and cooling water pumps used in synchrotron accelerator. The purpose of this paper is to evaluate the vibration level and spectrum condition for TPS water pump systems. In order to predictive maintenance before pump systems fail, the vibration monitoring system was constructed. After vibration test for several months, the alignment of some of the ice water pumps were found mismatched because of poor system positioning and operate continuously. Besides, the ice water pump were redundantly operated and switch over every Monday morning. The recorded data showed the system sometimes switch fail because of control status or system stability. Thus, the water pump systems were repaired and maintained base on vibration monitoring system. There is still some remain problems for ice water pump systems. The utility systems could prevent malfunction through regular vibration inspection and daily data acquisition.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL051
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPAL052 |
Finite Element Analysis on Beam-Induced Heat Load in in-Vacuum Undulators with a Small Magnet Gap |
3760 |
|
- J.-C. Chang, Y.-H. Liu
NSRRC, Hsinchu, Taiwan
|
|
|
In-vacuum undulators with a small gap and short period have been applied in synchrotron accelerators for hard X-rays users for years. However, beam-induced heat load resulted from synchrotron radiation or the image current will not only degrade the performance of undulator but damage the magnet foil. It is difficult to quantitatively study heat transfer phenomenon of the magnet foil through physical experiment. In this study, finite element analysis was applied to study the effect of beam-induced heat load on an in-vacuum undulator.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL052
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPAL053 |
Perveance Measurement of the TLS-Linac Klystron and the Evaluation of Its Operation Performance |
3763 |
|
- H.H. Chen, C.H. Kuo, K.-K. Lin, Y.-H. Liu
NSRRC, Hsinchu, Taiwan
|
|
|
The high power klystron is a radio frequency amplifier for TLS linac operation. It is a crucial device for electron acceleration in linac. How to evaluate its efficiency, lifetime and performance of klystron in operation is one of the major concern in this report. The key klystron parameter perveance is introduced and used for performance evaluation and operation status monitoring. It is important to execute periodic monitoring on perveance for ensuring a stable linac operation. Klystron characteristics diagnostics can be achieved through perveance measurement. A couple of klystron diagnostic parameters concerning perveance are explored for field examination purpose. Perveance comparison with factory acceptance test data is also presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL053
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|