Author: Kramer, T.
Paper Title Page
MOPMF062 Upgrade of the Dilution System for HL-LHC 261
 
  • C. Wiesner, W. Bartmann, C. Bracco, M. Calviani, E. Carlier, L. Ducimetière, M.I. Frankl, M.A. Fraser, S.S. Gilardoni, B. Goddard, T. Kramer, A. Lechner, N. Magnin, A. Perillo-Marcone, T. Polzin, E. Renner, V. Senaj
    CERN, Geneva, Switzerland
 
  The LHC Beam Dump System is one of the most critical systems for reliable and safe operation of the LHC. A dedicated dilution system is required to sweep the beam over the front face of the graphite dump core in order to reduce the deposited energy density. The High Luminosity Large Hadron Collider (HL-LHC) project foresees to increase the total beam intensity in the ring by nearly a factor of two, resulting in a correspondingly higher energy deposition in the dump core. In this paper, the beam sweep pattern and energy deposition for the case of normal dilution as well as for the relevant failure cases are presented. The implications as well as possible mitigations and upgrade measures for the dilution system, such as decreasing the pulse-generator voltage, adding two additional kickers, and implementing a retrigger system, are discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF062  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMF063 Asynchronous Beam Dump Tests at LHC 265
 
  • C. Wiesner, W. Bartmann, C. Bracco, E. Carlier, L. Ducimetière, M.I. Frankl, M.A. Fraser, B. Goddard, C. Heßler, T. Kramer, A. Lechner, N. Magnin, V. Senaj, D. Wollmann
    CERN, Geneva, Switzerland
 
  The detailed understanding of the beam-loss pattern in case of an asynchronous beam dump is essential for the safe operation of the future High Luminosity LHC (HL-LHC) with nearly twice the nominal LHC beam intensity, leading to correspondingly higher energy deposition on the protection elements. An asynchronous beam dump is provoked when the rise time of the extraction kickers is not synchronized to the 3 us long particle-free abort gap. Thus, particles that are not absorbed by dedicated protection elements can be lost on the machine aperture. Since asynchronous beam dumps are among the most critical failure cases of the LHC, experimental tests at low intensity are performed routinely. This paper reviews recent asynchronous beam dump tests performed in the LHC. It describes the test conditions, discusses the beam-loss behaviour and presents simulation and measurement results. In particular, it examines a test event from May 2016, which led to the quench of four superconducting magnets in the extraction region and which was studied by a dedicated beam experiment in December 2017.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF063  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF027 CERN PS Kicker for Proton Injection: from Beam-Based Waveform Measurements to Hardware Improvements 732
 
  • V. Forte, A. Ferrero Colomo, M.A. Fraser, T. Kramer
    CERN, Geneva, Switzerland
 
  For 2017 operation, the termination mode of the CERN Proton Synchrotron (PS) horizontal injection kicker was permanently changed to short-circuited, to be compliant with the future performances requested by the LHC Injectors Upgrade (LIU) project. An extensive campaign of measurements was performed through a dedicated beam-based technique. The measurements identified possibilities for optimisation of the kicker system and were fundamental to properly tune the PSpice simulation model of the kicker, as well as for validating the hardware changes. The model was finally used to estimate the horizontal emittance growth for the future injection schemes in the PS.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF027  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF058 Optimization of the FCC-hh Beam Extraction System Regarding Failure Avoidance and Mitigation 850
 
  • E. Renner, M.J. Barnes, W. Bartmann, F. Burkart, E. Carlier, L. Ducimetière, B. Goddard, T. Kramer, A. Lechner, N. Magnin, V. Senaj, J.A. Uythoven, P. Van Trappen, C. Wiesner
    CERN, Geneva, Switzerland
 
  A core part of the Future Circular Collider (FCC) study is a high energy hadron-hadron collider with a circumference of nearly 100~km and a center of mass beam energy of 100~TeV. The energy stored in one beam at top energy is 8.3~GJ, more than 20 times that of the LHC beams. Due to the large damage potential of the FCC-hh beam, the design of the beam extraction system is dominated by machine protection considerations and the requirement of avoiding any material damage in case of an asynchronous beam dump. Erratic operation of one or more extraction kickers is a main contributor to asynchronous beam dumps. The presented study shows ways to reduce the probability and mitigate the impact of erratic kicker switching. Key proposals to achieve this include layout considerations, different hardware options and alternative reaction strategies in case of erratic extraction kicker occurrence. Based on these concepts, different solutions are evaluated and an optimized design for the FCC-hh extraction system is proposed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF058  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF060 Injection and Dump Systems for a 13.5 TeV Hadron Synchrotron HE-LHC 858
 
  • W. Bartmann, M.J. Barnes, L. Ducimetière, B. Goddard, M. Hofer, T. Kramer, A. Lechner, E. Renner, A. Sanz Ull, V. Senaj, L.S. Stoel, C. Wiesner
    CERN, Geneva, Switzerland
 
  One option for a future circular collider at CERN is to build a 13.5 TeV hadron synchrotron, or High Energy LHC (HE-LHC) in the LHC tunnel. Injection and dump systems will have to be upgraded to cope with the higher beam rigidity and increased damage potential of the beam. The required modifications of the beam transfer hardware are highlighted in view of technology advancements in the field of kicker switch technology. An optimised straight section optics is shown.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF060  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMF075 Performance Measurements and Analysis of Jitter Like Events for the PS Injection Kicker System 2549
 
  • A. Ferrero Colomo, J.C.C.M. Borburgh, L. Ducimetière, L.M.C. Feliciano, V. Forte, M.A. Fraser, T. Kramer, L. Sermeus
    CERN, Geneva, Switzerland
 
  In the framework of the LIU project, several modifications have been made to the CERN PS injection kicker system during the winter stop 2016-2017 (EYETS). Current waveform and beam-based measurements were carried out in 2017 to validate the implemented design changes by observing the magnetic field impact on the beam. During these long-term measurements, increased values for the rise and fall times were observed when compared to single shot observations of the current waveform. An unknown source of jitter-like pre-firing in the main switch has been identified, creating an additional challenge to meet the already tight system rise and fall time specifications. This paper briefly describes the efforts made to fine tune the pulse generator after the EYETS, summarises the optimised configuration and analyses the observed jitter events. A new triggering system design is briefly outlined to address the issue.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF075  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMF076 First Prototype Inductive Adder for the FCC Injection 2553
 
  • D. Woog, M.J. Barnes, A. Ferrero Colomo, J. Holma, T. Kramer
    CERN, Geneva, Switzerland
 
  A highly reliable kicker system is required as part of the injection for the FCC. A significant weak point of conventional kicker systems is often the pulse generator, where a Pulse Forming Network/Line (PFN/PFL) is discharged through a thyratron switch to generate the current pulse for the kicker magnet. This design has several disadvantages: in particular the occasional erratic turn-on of the switch which cannot be accepted for the FCC. A potential replacement is the inductive adder (IA) that uses semiconductor switches and distributed capacitors as energy storage. The modular design, low maintenance and high flexibility make the IA a very interesting alternative. In addition, the ability to both turn-on and off the current also permits the replacement of PFN/PFL by the capacitors. A first FCC prototype IA, capable of generating 9 kV and 2.4 kA pulses, has been designed and built at CERN. It will be upgrade to a full-scale prototype (15 kV, 2.4 kA) in 2018. This paper presents measurement results from the 9 kV prototype and outlines the conceptual changes and expected performance of the 15 kV prototype.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF076  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMK003 An Upgraded LHC Injection Kicker Magnet 2632
 
  • M.J. Barnes, C. Bracco, G. Bregliozzi, A. Chmielinska, L. Ducimetière, B. Goddard, T. Kramer, H. Neupert, L. Vega Cid, V. Vlachodimitropoulos, W.J.M. Weterings, C. Yin Vallgren
    CERN, Geneva, Switzerland
  • A. Chmielinska
    EPFL, Lausanne, Switzerland
 
  Funding: Work supported by the HL-LHC project.
An upgrade of the LHC injection kickers is necessary for HL-LHC to avoid excessive beam induced heating of these magnets: the intensity of the HL-LHC beam will be twice that of LHC. In addition, in the event that it is necessary to exchange an injection kicker magnet, the newly installed kicker magnet would limit HL-LHC operation for a few hundred hours due to dynamic vacuum activity. Extensive studies have been carried out to identify practical solutions to these problems: these include redistributing a significant portion of the beam induced power deposition to ferrite parts of the kicker magnet which are not at pulsed high voltage and water cooling of these parts. Furthermore a surface coating, to mitigate dynamic vacuum activity, has been selected. The results of these studies, except for water cooling, have been implemented on an upgraded LHC injection kicker magnet: this magnet was installed in the LHC during the 2017-18 Year End Technical Stop. This paper presents the upgrades, including some test and measurement results.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)