Author: Kobayashi, Y.
Paper Title Page
THPMF042 Beam Based Measurement of Injection Parameters at KEK-PF 4152
 
  • K. Hirano
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima, Japan
  • K. Harada, N. Higashi, Y. Kobayashi, S. Nagahashi, T. Obina, R. Takai, H. Takaki, A. Ueda
    KEK, Ibaraki, Japan
 
  KEK-PF is a 2.5 GeV synchrotron radiation facility. In recent years, the injection efficiency using conventional pulsed septum and kicker magnets has decreased. The main cause of this problem seems to be the change of the injection parameters due to the accumulation of the errors including the effect of the earthquake on March 11, 2011. For the improvement of the injection efficiency, the precise and detailed parameters of the beam injection under present configuration are essential. In order to fix these parameters, we measure the response of the pulsed magnets by using injected and stored beams. In this presentation, we show the beam based measurement and the simulation results for the PF ring injection system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF042  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMF043 Development and Present Status of Photon Factory Light Sources 4155
 
  • T. Honda, Y. Kobayashi, S. Nagahashi, R. Takai
    KEK, Ibaraki, Japan
 
  Photon Factory of KEK manages two light sources, Photon Factory storage ring (PF-ring) and Photon Factory Advanced Ring (PF-AR) with an energy of 2.5 GeV and 6.5 GeV, respectively. Although it is unfortunate that the operation time of the accelerators is decreasing recent years due to a budget shortage and some unavoidable reconstructions, we are continuing the operation with a low failure rate and constructing a new beamline based on a novel undulator. Preparing for the start of the physics run of Super KEKB Factory, a new full energy beam transport line from the injector LINAC to PF-AR was constructed. With an installation of pulsed quadrupole magnets for the LINAC, continuous top-up injection has been established simultaneously for the four storage rings of PF and Super KEKB, and the operation of them has become compatible. As a result of increasing the injection energy of PF-AR form 3 GeV to 6.5 GeV, the beam instability during the injection disappeared, and the stability and efficiency of the injection improved significantly.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF043  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)