Paper | Title | Page |
---|---|---|
MOPMF018 | Numerical Simulation of Spin Dynamics with Spin Flipper in RHIC | 118 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. Spin flipper experiments during RHIC Run 17 were performed to study its effectiveness as a method for polarization sign reversal during stores. Numerical simulations are reported here, which were performed in accompaniment of these, and are being pursued with the aim of accurately reproducing the experimental conditions and providing thorough insight in the role of various key parameters participating in the dynamics of the spin flip, such as the sweep rate of the AC dipole, chromatic orbit control at RHIC snakes, RF parameters, possible effects of non-linear spin resonances, mirror resonance, tolerance on flipper magnet parameters, etc. The ultimate goal is for these simulations to serve as a guidance toward perfect flip to allow routine use during physics Runs. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF018 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUYGBD3 | eRHIC Design Status | 628 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The electron-ion collider eRHIC aims at a luminosity around 1034cm-2sec-1, using strong cooling of the hadron beam. Since the required cooling techniques are not yet readily available, an initial version with a peak luminosity of 3*1033cm-2sec-1 is being developed that can later be outfitted with strong hadron cooling. We will report on the current design status and the envisioned path towards 1034cm-2sec-1 luminosity. |
||
![]() |
Slides TUYGBD3 [11.790 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUYGBD3 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPMF025 | LEReC Photocathode DC Gun Beam Test Results | 1306 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. Low Energy RHIC Electron cooler (LEReC) project is presently under commissioning at Brookhaven National Laboratory (BNL). LEReC requires high average current up to 85mA and high-quality electron beam. A 400 kV DC gun equipped with a photocathode and laser system has been chosen to provide a source of high-quality electron beams. We started testing the DC gun during the RHIC run 2017. First electron beam from LEReC DC gun was delivered in April 2017 *. During the DC gun test critical elements of LEReC such as laser beam system, cathode exchange system, cathode QE lifetime, DC gun stability, beam instrumentation, the high-power beam dump system, machine protection system and controls have been tested. Average current of 10 mA for few hours of operation was reached in August 2017. In this paper we present experimental results and experience learned during the LEReC DC gun beam testing. * D. Kayran et al., "First Results of Commissioning DC Photo-gun for RHIC Low Energy Electron Cooler (LEReC)", in Proc of ERL2017. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPMF025 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |