Author: Kemel, M.
Paper Title Page
THPAK009 Benchmark Analyses of Electrostatic Devices for SPIRAL2-DESIR Beam Lines 3225
 
  • L. Perrot, M. Kemel, S. Rousselot
    IPN, Orsay, France
 
  Funding: French ANR, Investissements d'Avenir, EQUIPEX. Contract number ANR-11-EQPX-0012.
The new ISOL facility SPIRAL2 is currently being built at GANIL, Caen France. The commissioning of the accelerator is in progress since 2015. SPIRAL2 will produce a large number of new radioactive ion beams (RIB) at high intensities. In 2023, the DESIR facility will receive beams from the upgraded SPIRAL1 facility of GANIL (stable beam and target fragmentation), from the S3 Low Energy Branch (fusion-evaporation and deep-inelastic reactions). In order to deliver the RIB to the experimental set-ups installed in the DESIR hall, 140 meters of beam line are studied since 2014. The transfert lines are today fully design and building will start in 2018. Electrostatic devices (quadrupoles, steerers and deflectors) have been intensively study using various tools. This paper will focus on the detail results of a benchmark using OPERA3D and Comsol Multiphysics apply to the DESIR quadrupole conception.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAK009  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)