Author: Kang, Y.W.
Paper Title Page
TUPAL046 Construction, Test, and Operation of a new RFQ at the Spallation Neutron Source (SNS) 1113
 
  • Y.W. Kang, A.V. Aleksandrov, W.E. Barnett, M.S. Champion, M.T. Crofford, B. Han, S.W. Lee, J. Moss, R.T. Roseberry, J.P. Schubert, A.P. Shishlo, M.P. Stockli, C.M. Stone, R.F. Welton, D.C. Williams, A.P. Zhukov
    ORNL, Oak Ridge, Tennessee, USA
  • C.C. Peters, J. Price
    ORNL RAD, Oak Ridge, Tennessee, USA
 
  Funding: * This work was supported by SNS through UT-Battelle, LLC, under contract DEAC0500OR22725 for the U.S. DOE.
A new RFQ was successfully installed recently in the SNS linac to replace the old RFQ that was used for more than a decade with certain operational limitations. The new RFQ was completely tested with H ion source in the Beam Test Facility (BTF) at SNS. For robust operation of SNS at 1.4 MW, the full design beam power and to satisfy the beam current requirement of the forthcoming SNS proton power upgrade (PPU) project, an RFQ with enhanced performance and reliability was needed. The new RFQ was built to have the beam parameters identical to those of the first RFQ but with improved RF and mechanical stability and reliability for continuous operation of neutron production. The tests confirmed that the new RFQ can run with high beam transmission efficiency at around 90 % and notably improved operational stability. In this paper, construction, test, installation, and operation of the new RFQ in SNS are discussed with the performance improvements.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL046  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAL063 RF and Thermo-Mechanical Considerations in Designing the Waveguide Iris Coupler for the Drift Tube Linac in the ORNL Spallation Neutron Source 3796
 
  • S.W. Lee, Y.W. Kang
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: This work was supported by SNS through UT Battelle, LLC, under contract DE AC05 00OR22725 for the U.S.DOE
The Spallation Neutron Source (SNS) employs tapered ridge waveguide iris couplers to power six drift tube linac (DTL) cavity structures with pulsed RF systems using 2.5MW klystrons at 402.5MHz. All DTL iris couplers have been operating continuously for more than a decade without replacement. Transferring high RF energy to the cavities requires robust RF and mechanical performances with respect to power dissipation, electrical breakdown, and vacuum pressure. Considering the upcoming full 1.4MW operation and the future proton power upgrade (PPU) project, the structural design and the material selection needed to be reviewed for potential spare manufacturing. The existing design and the modified design with improvements to the coupler have been numerically studied. For the study, 3D models were used for RF and structural characterizations of the waveguide iris couplers on the DTL cavity. RF and thermo-mechanical co-simulations were performed to assess the effects of using the different materials and the structural modification.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAL063  