Author: Kain, V.
Paper Title Page
TUPAF020 Performance of the CERN Low Energy Ion Ring (LEIR) with Xenon beams 705
 
  • R. Alemany-Fernández, S.C.P. Albright, O. Andujar, M.E. Angoletta, J. Axensalva, H. Bartosik, G. Baud, N. Biancacci, M. Bozzolan, S. Cettour Cave, K. Cornelis, J. Dalla-Costa, M. Delrieux, A. Dworak, A. Findlay, F. Follin, A. Frassier, M. Gabriel, A. Guerrero, M. Haase, S. Hirlaender, S. Jensen, V. Kain, L.V. Kolbeck, Y. Le Borgne, D. Manglunki, O. Marqversen, S. Massot, D. Moreno Garcia, D.J.P. Nicosia, S. Pasinelli, L. Pereira, D. Perez, A. Rey, J.P. Ridewood, F. Roncarolo, Á. Saá Hernández, R. Scrivens, O.G. Sveen, G. Tranquille, E. Veyrunes
    CERN, Geneva, Switzerland
 
  In 2017 the CERN Low Energy Ion Ring demonstrated once more the feasibility of injecting, accumulating, cooling and accelerating a new nuclei, 129Xe39 . The operation of this new ion species started at the beginning of March with the start up of the xenon ion source and the Linac3. Ten weeks later the beam arrived to the Low Energy Ion Ring (LEIR) triggering the start of several weeks of beam commissioning in view of providing the injector complex with Xenon beams for different experiments and a series of machine development experiments in LEIR. Two types of beams were setup, the so called EARLY beam, with a single injection into LEIR from Linac3, and the NOMINAL beam with up to seven injections. 2017 was as well an interesting year for LEIR because several improvements in the control system of the accelerator and in the beam instrumentation were done in view of increasing the machine reliability. This paper summarises the beam commissioning phase and all the improvements carried out during 2017.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF021 Identification and Removal of SPS Aperture Limitations 709
 
  • V. Kain, R. Alemany-Fernández, H. Bartosik, S. Cettour Cave, K. Cornelis, P. Cruikshank, J.A. Ferreira Somoza, B. Goddard, C. Pasquino
    CERN, Geneva, Switzerland
 
  The CERN SPS (Super Proton Synchrotron) serves as LHC injector and provides beam for the North Area fixed target experiments. Since the 2016 run automated local aperture scans have been performed with the main focus on the vertical plane where limitations typically arise due to the flat vacuum chambers in most SPS elements. For LHC beams the aperture limitations with the present low integer tune optics also occur at locations with large dispersion. Aperture measurements in the horizontal plane using a variety of techniques were performed and showed surprising results, which could partially explain the unexpected losses of high intensity LHC beams at the SPS flat bottom. In this paper, reference measurements from 2016 are compared with the ones taken at the beginning of the run in 2017. Several aperture restrictions in the vertical plane could be found and cured, and a potential systematic restriction in the horizontal plane has been identified. The results of the measurements and the origin of the restrictions are presented in this paper, and the outlook for partial mitigation is discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF024 Impedance and Instability Studies in LEIR with Xenon 720
 
  • N. Biancacci, H. Bartosik, M. Gąsior, S. Hirlaender, V. Kain, T.E. Levens, E. Métral
    CERN, Geneva, Switzerland
  • M. Migliorati
    Rome University La Sapienza, Roma, Italy
 
  In 2017, the LEIR accelerator has been operated with Xe39+ beam for fixed target experiments in the SPS North Area. The different ion species, with respect to the usually operated Pb54+, allowed for additional comparative measurements of tune shift versus intensity at injection energy both in coasting and bunched beams. The fast transverse instability observed for high accumulated intensities has been as well characterized and additional observations relevant to impedance have been collected from longitudinal Schottky signal and BTF measurements. The results of these measurements are summarised and compared to the currently developed machine impedance model.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF024  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF033 Beam Optics Studies for BDF and for Tests of a Prototype Target 754
 
  • C. Heßler, M. Calviani, Y. Dutheil, M.A. Fraser, B. Goddard, V. Kain, E. Lopez Sola, F.M. Velotti
    CERN, Geneva, Switzerland
 
  Within the frame of the Physics Beyond Collider project a new fixed target facility at the SPS North Area, the so-called Beam Dump Facility (BDF), is under study. BDF requires a high intensity slowly extracted 400 GeV proton beam with 4·1013 protons per 1 s spill to achieve 4·1019 protons on target per year. This results in an exceptionally high average beam power of 355 kW on the target, which is a major challenge. To validate the target design, a test of a prototype target is planned for 2018 at an existing North Area beam line. A large part of this beam line is in common with the future BDF beam line with comparable beam characteristics and several measurement campaigns were performed in 2017 to study the optics of the line in preparation for the test. The intrinsic characteristics of the slow extraction process make the precise characterisation of the beam reaching the target particularly challenging. This paper presents beam and lattice characterisation methods and associated measurement results.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF033  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF034 LEIR Injection Efficiency Studies as a Function of the Beam Energy Distribution from Linac3 758
 
  • S. Hirlaender, R. Alemany-Fernández, H. Bartosik, G. Bellodi, N. Biancacci, V. Kain, R. Scrivens
    CERN, Geneva, Switzerland
 
  High intensities in the CERN Low Energy Ion Ring (LEIR) are achieved using multi-turn injections from the pre-accelerator Linac3 combined with simultaneous stacking in momentum and transverse phase spaces. Up to seven consecutive 200 μs long, 200 ms spaced pulses are injected from Linac3 into LEIR by stacking each of them into the six-dimensional phase-space over 70 turns. An inclined septum magnet allows proper filling of the transverse phase-space plane, while longitudinal stacking requires momentum variation achieved by a shift of mean momentum over time provided by phase shifting a combination of 2 RF cavities at the exit of Linac3. The achievable maximum accumulated intensity depends strongly on the longitudinal beam quality of the injected beam. The longitudinal Schottky signal is used to measure the received energy distribution of the circulating beam which is then correlated with the obtained injection efficiency. This paper presents the experimental studies to understand and further improve the injection reliability and the longitudinal stacking.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF034  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF035 Observations of SPS Slow-Extracted Spill Quality Degradation and Possible Improvements 761
 
  • F.M. Velotti, H. Bartosik, K. Cornelis, M.A. Fraser, B. Goddard, S. Hirlaender, V. Kain, O. Michels, M. Pari
    CERN, Geneva, Switzerland
 
  The SPS delivers slow extracted proton and heavy ion spills of several seconds to the North Area fixed target experiments with a very high duty factor. Reduced machine reproducibility due to magnetic history and power supply ripples on the main circuits lead however to frequent degradation of the spill duty factor. In this paper, the measured effect of the SPS magnetic history on spill quality and principal machine parameters is presented. Another detailed measurement campaign was aimed at characterising the frequency content and response of the spill to noise on the main power supplies ripples. The main findings of this study will also be reported. Finally, simulations of possible improvements based on the data acquired are discussed, as well as an extrapolation to the possible spill quality after the implementation of the improvements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF035  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF036 Studies of the Injection and Cooling Efficiency in LEIR Using the Longitudinal Schottky Spectrum 765
 
  • S. Hirlaender, R. Alemany-Fernández, H. Bartosik, N. Biancacci, V. Kain
    CERN, Geneva, Switzerland
 
  The CERN Low Energy Ion Ring (LEIR) has two main operational beams with their associated cycles, the so-called EARLY and the NOMINAL beam. The EARLY beam consists of a single injected pulse from the LINAC3 accelerator, whereas seven consecutive injections are accumulated, and electron cooled for the NOMINAL beam. In both cases, the longitudinal Schottky monitor allows assessing the longitudinal particle distribution during the cooling process on the injection plateau. A method has been established to analyze the Schottky signal, reconstruct the initial particle momentum distribution and derive relevant parameters such as the cooling time, energy off-set of injected and stacked beam or the momentum distribution of the lost beam. The variations of the obtained parameters and the impact on the LEIR performance will be addressed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF036  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF050 Beam Dynamics Simulations of the Effect of Power Converter Ripple on Slow Extraction at the CERN SPS 818
 
  • J. Prieto, M.A. Fraser, B. Goddard, V. Kain, L.S. Stoel, F.M. Velotti
    CERN, Geneva, Switzerland
 
  The SPS provides slowly extracted protons at 400 GeV/c to CERN's North Area Fixed Target experiments over spills of duration from 1-10 seconds. Low frequency ripple on the current in the main magnets originating from their power converters is a common issue that degrades the slow-extracted spill quality. In order to better understand how the stability of the power converters affects losses, beam emittance and spill quality, particle tracking simulations were carried out using MAD-X and compared to measurements, with the impact of each magnet circuit investigated systematically. The implications for the performance of the SPS slow extraction are discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF050  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF052 Effects of Electrostatic Septum Alignment on Particle Loss During Slow Extraction at CERN SPS 826
 
  • J. Prieto, Y. Dutheil, M.A. Fraser, B. Goddard, V. Kain, L.S. Stoel, F.M. Velotti
    CERN, Geneva, Switzerland
  • M.A. Kagan
    SLAC, Menlo Park, California, USA
 
  Slow extraction is an intrinsically lossy process that splits the beam with an electrostatic septum (ES), employing a thin-wire array to delimit the high electric field region that deflects the beam into the extraction channel. At CERN's Super Proton Synchrotron (SPS) the ES is over 16 m long and composed of 5 separate units containing separate wire-arrays that can be moved independently. The tanks are all mounted on a single support structure that can move the ensemble coherently. As a result, the large number of positional degrees of freedom complicates the alignment procedure in operation. Obtaining and maintaining accurate alignment of the ES with the beam is therefore crucial for minimising beam loss. In this paper, we investigate the alignment procedure for different operational scenarios using particle tracking simulations to understand the beam loss along the extraction straight as a function of the relative positions of each of the 5 separate ES units. An important aspect of the study was to understand the required alignment tolerance to achieve optimum extraction efficiency for a given configuration of wire-array thicknesses.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF052  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF053 Optimization of Diffuser (Pre-Scatterer) Configurations for Slow Extraction Loss Reduction at Electrostatic Septa 830
 
  • B. Goddard, B. Balhan, J.C.C.M. Borburgh, M.A. Fraser, L.O. Jorat, V. Kain, C. Lolliot, L.S. Stoel, P. Van Trappen, F.M. Velotti
    CERN, Geneva, Switzerland
  • D. Barna
    Wigner Research Centre for Physics, Institute for Particle and Nuclear Physics, Budapest, Hungary
  • V.P. Nagaslaev
    Fermilab, Batavia, Illinois, USA
 
  Uncontrolled beam loss at the electrostatic septum is a performance limit for several existing or planned high power hadron accelerators delivering slow-extracted spills to fixed targets. A passive diffuser, or pre-scatterer, in a suitable configuration has been shown to reduce such beamloss significantly, with the actual gain factor depending on the parameters and details of the extraction process and hardware. In this paper, the optimization of diffuser configurations is investigated for a range of beam energies and extraction conditions, and the sensitivity to the available parameters explored via simulation results. The advantages and limitations of the diffuser are discussed and conclusions drawn concerning the specific case studies of the 8 GeV Fermilab debuncher ring and 400 GeV CERN SPS.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF053  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF054 Slow Extraction Efficiency Measurements at the CERN SPS 834
 
  • M.A. Fraser, K. Cornelis, L.S. Esposito, B. Goddard, V. Kain, F. Roncarolo, L.S. Stoel, F.M. Velotti
    CERN, Geneva, Switzerland
 
  The high efficiency of most slow extraction systems makes quantifying the exact amount of beam lost in the process extremely challenging. This is compounded by the lack of time structure in the extracted beam, as is typically required by the high-energy physics experiments, and the difficulty in accurately calibrating D.C. intensity monitors in the extraction line at count rates of ~ 1013 Hz. As a result, it is common for the extraction inefficiency to be measured by calibrating the beam loss signal induced by the slow extraction process itself. In this paper, measurements of the extraction efficiency performed at the CERN Super Proton Synchrotron for the third-integer resonant slow extraction of 400 GeV protons over recent years will be presented and compared to expectation from simulation. The technique employed will be discussed along with its limitations and an outlook towards a future online extraction efficiency monitoring system will be given.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF054  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAF085 Upgrade of the CERN SPS Beam Position Measurement System 2047
 
  • M. Wendt, M. Barros Marin, A. Boccardi, T.B. Bogey, V. Kain, C. Moran Guizan, A. Topaloudis
    CERN, Geneva, Switzerland
  • I. Degl'Innocenti
    Università di Pisa, Pisa, Italy
 
  The CERN Super Proton Synchrotron (SPS) is a fast cycling hadron accelerator delivering protons with momenta of up to 450 GeV/c for the Large Hadron Collider (LHC), fixed target experiments and other users such as the AWAKE plasma acceleration experiment, and also used to accelerate heavy ions. This paper presents the upgrade initiative for the SPS beam position measurement system in the frame of the CERN LHC Injector Upgrade (LIU) project. The new SPS beam position read-out electronics will be based on logarithmic amplifiers, using signals provided by the 216 existing beam position monitors, the majority of which are based on split-plane 'shoebox' technology. It will need to cover a dynamic range sufficient to manage the wide range of SPS beam intensities and bunch formatting schemes to provide turn-by-turn and averaged beam orbits along the SPS acceleration cycles. In order to avoid long coaxial cables, the front-end electronics including the digitisation, will be located inside the accelerator tunnel, with optical transmission to surface processing electronics. This represents an additional challenge in terms of radiation tolerance of electronics components and materials.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAF085  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMF015 Lifetime and Beam Losses Studies of Partially Strip Ions in the SPS (129Xe39+) 4070
 
  • S. Hirlaender, R. Alemany-Fernández, H. Bartosik, N. Biancacci, T. Bohl, S. Cettour Cave, K. Cornelis, B. Goddard, V. Kain, M.W. Krasny, M. Lamont, D. Manglunki, G. Papotti, M. Schaumann, F. Zimmermann
    CERN, Geneva, Switzerland
  • K. Kroeger
    FSU Jena, Jena, Germany
  • V.P. Shevelko
    LPI RAS, Moscow, Russia
  • T. Stöhlker, G. Weber
    IOQ, Jena, Germany
 
  The CERN multipurpose Gamma Factory proposal relies on using Partially Stripped Ion (PSI) beams, instead of electron beams, as the drivers of its light source. If such beams could be successfully stored in the LHC ring, fluxes of the order of 1017 photons/s, in the gamma-ray energy domain between 1 MeV and 400 MeV could be achieved. This energy domain is out of reach for the FEL-based light sources as long as the multi TeV electron beams are not available. The CERN Gamma Factory proposal has the potential of increasing by 7 orders of magnitude the intensity limits of the present Inverse Compton Scattering sources. In 2017 the CERN accelerator complex demonstrated its flexibility by producing a new, xenon, ion beam. The Gamma Factory study group, based on this achievement, requested special studies. Its aim was to inject and to accelerate, in the SPS, partially stripped xenon ions Xe39+ measure their life time, and determine the relative strength of the processes responsible for the PSI beam losses. This study, the results of which are presented in this contribution, was an initial step in view of the the future studies programmed for 2018 with lead PSI beams.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)