Paper |
Title |
Page |
TUPAF052 |
Effects of Electrostatic Septum Alignment on Particle Loss During Slow Extraction at CERN SPS |
826 |
|
- J. Prieto, Y. Dutheil, M.A. Fraser, B. Goddard, V. Kain, L.S. Stoel, F.M. Velotti
CERN, Geneva, Switzerland
- M.A. Kagan
SLAC, Menlo Park, California, USA
|
|
|
Slow extraction is an intrinsically lossy process that splits the beam with an electrostatic septum (ES), employing a thin-wire array to delimit the high electric field region that deflects the beam into the extraction channel. At CERN's Super Proton Synchrotron (SPS) the ES is over 16 m long and composed of 5 separate units containing separate wire-arrays that can be moved independently. The tanks are all mounted on a single support structure that can move the ensemble coherently. As a result, the large number of positional degrees of freedom complicates the alignment procedure in operation. Obtaining and maintaining accurate alignment of the ES with the beam is therefore crucial for minimising beam loss. In this paper, we investigate the alignment procedure for different operational scenarios using particle tracking simulations to understand the beam loss along the extraction straight as a function of the relative positions of each of the 5 separate ES units. An important aspect of the study was to understand the required alignment tolerance to achieve optimum extraction efficiency for a given configuration of wire-array thicknesses.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF052
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|