TUPAF003 | Integrated Prototyping in View of the 100 MeV Linac for Myrrha Phase 1 | 661 |
|
||
Funding: Work partially supported by the European Commission H2020 programme MYRTE #662186 The MYRRHA project borne by SCK•CEN, the Belgian Nuclear Research Centre, aims at realizing a pre-industrial Accelerator Driven System (ADS) for exploring the transmutation of long lived nuclear waste. The linac for this ADS will be a High Power Proton Accelerator delivering 2.4 MW CW beam at 600 MeV. It has to satisfy stringent requirements for reliability and availability: a beam-MTBF of 250h is targeted. The reliability goal is pursued through a phased approach. During Phase 1, expected till 2024, the MYRRHA linac up to 100 MeV will be constructed. It will allow to evaluate the reliability potential of the 600 MeV linac. It will also feed a Proton Target Facility in which radioisotopes of interest will be collected through an ISOL system. This contribution will focus on the transition to integrated prototyping, which will emphasize (i) a test platform consisting of the initial section of the normal conducting injector (5.9 MeV), (ii) the realization of a complete cryomodule for the superconducting linac and of its cryogenic valve box. The cryomodule will house two 352 MHz single spoke cavities operated at 2K. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF003 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPAF016 | Increase of IPHI Beam Power at CEA Saclay | 694 |
|
||
For the first time, in April 2016, the SILHI source produced a proton beam for IPHI RFQ. Due to several technical difficulties on the RFQ water cooling skid, a short RF power pulse (100 μs at the beginning until few hundred microseconds) is injected into the RFQ accelerates the high intensity proton beam up to 3 MeV. The repetition rate is tuned between 1 and 5 Hz. Under these conditions, the beam power after the RFQ is lower than 100 W. At the end of 2017, the 352 MHz RFQ conditioning has been completed (with the same duty cycle) and the proton beam has been accelerated. The increase of the beam power is expected to continue in 2018 in order to reach several kilowatts by the end of the year. In addition, two Ionization beam Profile Monitors (IPM) developed for ESS have been tested on the deviated beam line with a very low duty cycle. The IPHI facility should demonstrate the possibility to produce neutrons with a flexible compact accelerator in the framework of the SONATE project. This paper presents the status of the IPHI project in April 2018. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF016 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |